Closed
Save

Uninterruptible Power Systems Maintenance and Repair

Department of Defense (DoD) > U.S. Army
Service Contract
$17K – $418K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring maintenance and repair services for Uninterruptible Power Systems (UPS) for the MTC FTIG. Key requirements include 24/7 emergency repair services, preventative maintenance twice a year, and timely reporting of service issues.

Generated 58d ago

Scope & Requirements

The contractor will provide maintenance, repairs, and upgrades for UPS systems, ensuring operational readiness and emergency response capabilities.

Deliverables

  • Detailed report in PDF format after service
  • Two preventative maintenance services annually

Contract Details

Contract Type
Service Contract
Contract Vehicle
Blanket Purchase Agreement
Estimated Value
$17K – $418K per task order
BPA ceiling: $3M
Similar contracts award $17K$418K (median $75K, 10,336 awards)
Period of Performance
2026-05-01 to 2031-04-30
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
FAR 19.5

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Department of the Army National Guard Bureau

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 6, 2026
Last Updated2mo ago
Apr 6, 2026
Became Solicitation2mo ago
Apr 6, 2026
Tracked
Response Due2mo ago
Apr 16, 2026

Description

This is a blanket purchase agreement. The

period of performance is

1 May 2026 through

30 April 2031. General: This is a service contract to provide all necessary support to perform UPS service, maintenance, repairs and replacement/upgrade of outdated parts or equipment for the MTC FTIG. The contractor shall provide 24/7/365 emergency repair services to address any unscheduled system failures. The contractor shall provide a telephone response from a qualified technician within four (4) hours of receiving an emergency service call. If the issue cannot be resolved remotely, the contractor shall have a technician on-site within twenty-four (24) hours. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor shall respond to requests for corrective maintenance within 8 hours from the time the customer requests that service. The contractor shall diagnose the system failure and provide the cost estimated to restore the UPS to full operational status. This includes all necessary labor and the replacement of failed parts. The contractor is to furnish a detailed report to the COR in PDF format no later than 1 week after performing service. Any issues or deficiencies found during performance are to be immediately reported to the COR with proposed corrective action. The contractor shall provide two preventative maintenance services annually to be scheduled at the convenience of the Government. Preventative maintenance includes but is not limited to the following: Visual Inspection: inspect the UPS and battery cabinets for any signs of damage, overheating, fluid leakage, or loose connections. Verify that all air inlets and outlets are clean and free of obstructions to ensure proper ventilation. Check for and clean any accumulation of dust or debris on internal and external components. Mechanical and electrical checks: check all electrical connections, including internal wiring, breakers, and terminal blocks, to manufacturer-recommended specifications. Verify the integrity and functionality of all system components, including circuit breakers, fuses, and capacitors. Measure and record all critical AC and DC operational parameters (input/output voltage and current, frequency, battery voltage, and charge current). Rectifier: Record input/output voltages and currents. Verify proper float and equalize settings for installed battery plant. Verify tolerance on the filtered DC bus. Verify system alignments are within factory specifications. Inverter: Record input/output voltages and currents. Verify proper operation of inverter. Verify system alignments are within factory specifications. Verify DC currents on output of each inverter power stage. Static Switch: Record Inverter input voltage and currents to Static Switch. Record Bypass input voltage and currents to Static Switch. Record Static Switch output voltages and currents. Verify proper operation of the static switch. Verify system alignments are within factory specifications. Power Supplies: Verify proper output voltage of each internal power supply. Check for proper filtering of power supply output voltage. Confirm power supply redundancy if applicable. General: Check for proper fan operation. Inspect general overall condition of battery plant. Confirm acceptable environmental conditions exist for applicable parts coverage. Not all items are applicable to all systems. System functional tests: perform a full functional test of the UPS, including transferring the load from utility power to battery power and back to utility power to stimulate a power outage. Verify functionality of all system alarms, indicators, and communication interfaces. Calibrate the system as necessary to ensure all operational readings are within acceptable tolerances. The contractor will provide annual battery maintenance to be scheduled at the convenience of the Government. Battery maintenance includes but is not limited to the following: Review Customer battery maintenance logs and make entries into customer logs. Perform semi-annual preventive maintenance inspection as follows: Measure and record the voltage of each individual battery cell. Measure and record total voltage per cabinet / rack Measure and record ambient room temperature and humidity of the operating environment. Conduct an impedance test on each battery to assess its internal condition and ability to hold a charge. Perform a load test to verify the battery system can support the critical load for the specified runtime. Measure and record AC ripple current. Measure and record AC milli-volt per unit. Visual inspection: Check jar and cover for signs of leakage. Check for corrosion on terminal post or connector. Check for general appearance and cleanliness of battery room. Clean all battery terminals and posts. Apply protective coating to all terminals to prevent corrosion. Re-torque all battery connections to manufacturer specifications. The contractor shall provide a detailed report and quotation for the replacement of any battery that fails testing or shows signs of impending failure. Warning/hazard labels. Operational information and placards. Eye wash and deluge shower (if applicable). Goggles, gloves and aprons (if applicable). The contractor shall contain, collect, and dispose of hazardous and non-hazardous wastes and residues generated as a result of this contract, and dispose of all wastes off Fort Indiantown Gap, PA at disposal sites authorized by federal, state, and local laws and regulations for no additional cost. Contractor shall conduct any sampling necessary to properly characterize any waste prior to disposal and shall properly document all such waste determinations. Work shall be performed in accordance with all federal, state, and local laws and regulations. The contractor shall take responsibility for the cleanup for spills that may occur from their supplies or equipment during the operation, at no cost to the Government. The contractor will provide, in writing, to the POC the following information 15 days prior to the execution of this contract: Local Contractor POC Details. Name and location of the contractor. POC and of the contractor. Hours of operation of the contractor. Government Responsibilities. The government will provide POC information, in writing, to the contractor with the following information 15 days prior to the execution of this contract: Name and location of the Government POC. Michael Hancock Alternative

Point of Contact John M O'Boyle to this opportunity. BPA

Questions.pdf Solicitation - W912KC26RA004 Professional Appearance.pdf Wage Determination 2015-4231 Revision No. 30.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.