Fort Buchanan Microgrid Construction Project - Department of Defense

Department of Defense (DoD) > U.S. Army > US Army Corps of Engineers, Engineer Division Great Lakes and Ohio River, Louisville District
Firm-Fixed-Price (FFP)
$15K – $364K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a design-build construction project to install an 8 MW microgrid at Fort Buchanan, including diesel generators, battery storage, and control systems. The project aims to enhance energy resilience.

Generated 57d ago

Scope & Requirements

The project involves installing an 8 MW microgrid at Fort Buchanan, including diesel generators, battery storage, control systems, and integration with existing renewable energy sources.

Deliverables

  • Installation of 8 MW diesel generators
  • 4 MWh battery energy storage system (BESS)
  • Microgrid control system
  • Electrical interconnection switchgear
  • Interconnection circuit wirings
  • Modification to existing electrical distribution system
  • Net metering and interconnection agreements
  • Start-up commissioning
  • Assessment & authorization

Contract Details

Contract Type
Firm-Fixed-Price (FFP)
Awarded Amount
$15K – $364K per task order
IDIQ ceiling: $45M, 1 awardee
Similar contracts award $15K$364K (median $63K, 1,815 awards)
Size Limitation
Period of Performance
1141 calendar days from Notice to Proceed
Expected Awards
1
NAICS Codes
Place of Performance
Fort Buchanan, USA

Qualifications & Eligibility

Set-Aside Category
General Small Business
NAICS Size Standard
$45,000,000.00

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE ARMY
Office
US Army Corps of Engineers, Engineer Division Great Lakes and Ohio River, Louisville District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 7, 2026
Last Updated2mo ago
Apr 7, 2026
Became Award Notice2mo ago
Apr 7, 2026
Tracked
Response Due2mo ago
Apr 13, 2026

Description

This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option.

In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communication connections.

The project will install twelve 12,000-gallon above-ground, ballistic-resistant, diesel fuel tanks with a fuel polishing system to sustain critical operations continuously for 14 days.

The microgrid will include integration of existing large-scale onsite generation (4.65 MW from solar photovoltaic (PV) array and two 275 kW wind turbines).

The project also includes site work, start-up commissioning, interconnection agreement, assessment & authorization and all associated costs.

The microgrid system will support energy resiliency by providing on-site energy generation, this includes the installation of diesel generators, microgrid control system, electrical interconnection switchgear, interconnection circuit wirings, and modification to the existing electrical distribution system as necessary to establish the Fort Buchanan microgrid network.