Closed
Save

Upgrade Steam Distribution System Phase 2 Industry Day

Veterans Affairs (VA)Sol: 36C24126Q0472_IndustryDay
TBD
est. $100K – $25M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Veterans Affairs is conducting an Industry Day for the Upgrade Steam Distribution System Phase 2 project. The work involves the removal and upgrade of the steam distribution system in multiple buildings, including necessary construction, power distribution, and hazardous material removal. Contractors will coordinate with the Contracting Officer Representative to complete the work in phases as outlined in the specifications and drawings.

Generated 30d ago

Contract Details

Contract Type
TBD
Estimated Value
est. $100K – $25M
Similar contracts award $25K$400K (median $99K, 73,582 awards)Above typical range
NAICS Codes

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Response Due1mo ago
May 1, 2026
Published1mo ago
May 1, 2026
Last Updated1mo ago
May 1, 2026
Became Presolicitation1mo ago
May 1, 2026
Tracked
Notice Response Date22d ago
May 13, 202616:30

Description

This is an Industry Day Posting for the 631-19-002 Upgrade Steam Distribution System Phase 2. Please read the Special Notice and RSVP accordingly. Work includes the removal and upgrade of steam distribution system in Buildings 1, 4, 5, 8, 9, 15, 16. Work will be completed in multiple phases within each building as coordinated between the awarded contractor and COR. Work includes the necessary removal of existing structures, new construction, and certain other items in order to upgrade the steam distribution system as indicated in the Specifications and Drawings. Work also includes power distribution to new system components where required and upgrades or connections to the existing campus BMS to control new installations where required and the removal of existing hazardous materials including asbestos and lead paint. The

scope of work also includes the construction of fire rated containment and ICRA barriers at all areas of demolition, asbestos abatement, lead removal, new construction, etc. Brian Kelly Alternative

Point of Contact NCO1 Construction Team 2 Contracting (No Street Address

2) , US to this opportunity. 631-19-002 Steam Ph2 Bid Drawings 3-31-2026_Rev1.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.