Closed
Save

Facility Pressure Washing Services

Veterans Affairs (VA) > 248-NETWORK CONTRACT OFFICE 8 (36C248)
SDVOSB
$300K – $500K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Veterans Affairs is seeking pressure washing services for the main entrances and walkways of multiple buildings at the C.W. Bill Young VA Healthcare System. The contractor will be responsible for providing all necessary labor, materials, and equipment to maintain cleanliness over approximately 155,000 sq. ft. of area, with services required twice annually.

Generated 79d ago

Scope & Requirements

The contractor will perform pressure washing services at the main entrances and walkways of the C.W. Bill Young VA Healthcare System, ensuring cleanliness and maintenance of the areas.

Contract Details

Contract Value
$300K – $500K
Similar contracts award $12K$60K (median $27K, 2,455 awards)Above typical range
NAICS Codes
Place of Performance
Bay Pines, FL, USA
Set-Asides
SDVOSB

Qualifications & Eligibility

Set-Aside Category
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
248-NETWORK CONTRACT OFFICE 8 (36C248)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 12, 2026
Last Updated3mo ago
Mar 12, 2026
Became Solicitation3mo ago
Mar 12, 2026
Tracked
Response Deadline3mo ago
Mar 19, 202614:00
Response Due2mo ago
Mar 30, 2026

Description

Good day, SDVOSB s, VOSB s, SB s This Sources Sought is issued solely for informational and planning purposes only. It does not constitute the issuance of a solicitation or a promise to issue a solicitation in the future. The purpose of this notice is to conduct market research and obtain information from qualified SDVOSB businesses. This is not a request for bids, quotes, offers, or proposals. The responses to this announcement will assist in determining the socio-economic status such as a SDVOSB set-aside if feasible. If insufficient SDVOSB responses are received to establish the basis for setting this requirement aside for SDVOSB s, the requirement may be solicited as a VOSB or a SB set aside in which case all interested parties responding shall be eligible to compete. Please direct reply in the affirmative via email if you are interested and can provide the required service/product for this requirement. Please provide your capability statement, I will accept responses for this Sources Sought until the 19th of March, 2026 at 14:00 EST, thanks. PERFORMANCE WORK STATEMENT PRESSURE WASHING SERVICES Introduction The Government requires the pressure washing services to main entrances including walkways of multiple buildings located on the C.W. Bill Young Medical Center, Bay Pines VA Healthcare System campus. Description/Scope/

Objective The Contractor shall provide all labor, transportation, materials, equipment, and supervision required to perform complete cleanliness related services at the Bay Pines VA Healthcare System main entrances of buildings listed below for approximately 155,000 sq. ft, in total combined areas in a manner that will maintain a clean, neat, safe and professional appearance throughout the areas covered under the contract. Applicable Documents 3.1. The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply: FAR Federal Acquisition Regulation VAAR Veterans Administration Acquisition Regulation SCA DOL Website Service Contract Act (SCA) Directory of Occupations (Fifth Edition) http://www.dol.gov/whd/contracts/sca.htm ANSI https://pdflakekxng.files.wordpress.com/2015/04/ansi-z133-safety-standard-pdf.pdf VA Directive 0057 VA Environmental Program https://www.va.gov/vapubs/Search_action.cfm VA Directive 0058 VA Green Purchasing Program https://www.va.gov/vapubs/Search_action.cfm 3.2. Glossary: Acronyms used in this PWS are listed below for easy reference: CO

Contracting Officer COR

Contracting Officer s Representative POC

Point of Contact FAR Federal Acquisition Regulation UF University of Florida IPM Integrated Pest Management Plan Performance

Requirements Upon award of contract, the Contractor shall pressure wash the main entrances, walkways, and any sitting area within, for the duration of the contract twice annually (2 times a year). The Contractor shall ensure that the entryway has been cleared of dirt, stains, moss and algae that has accumulated on the tiles. The Contractor shall clear out any dirt and debris that s collected in the drains after the area has been thoroughly rinsed off. The Contractor will replace any tiles, signs, and any other item broken due to pressure washing. The Contractor shall inform the POC of any damages that is present in the area. The Contractor will pressure wash the entrances every 6 months. The Contractors shall perform the work after the hours of operations to prevent the disruption of patient care. The Contractor shall seal off the areas during the cleaning process with a barrier to prevent bystanders from interfering with the work. The Contractor shall insure to use strong commercial chemical cleaners to remove the grease, stains from walks, walls, and entryways The Contractor shall rinse off the chemicals with hot water. The Contractor shall insure the proper disposal of the water mix with chemicals. The Contractor shall insure that the areas are properly degreased and free of stains before determining the job has been completed. The following building entrances and walkways are to be cleaned twice per year Building Entrances to be cleaned twice a year: Building 1 - Canteen Entrance Doors, Walls, Lights, Stairs, Curbs, Tables, Benches, Trashcans, Walkways, Picnic Pads, and Patio Building 1 - Dockside Entrance Doors, Overhang, Walls, Curbing, Railing, and Ramp to Parking Lot Building 1 - Main Waterside Entrance Doors, Walls, Lights, Walkways, and Stairs Building 2 - North Entrance Doors, Lights, Walls, Trashcan, Ceiling, Walkways, Stairs, Ramp to Parking, and Railing Building 2 - East Main Entrance Doors, Walls, Stairs, Lights, Railing, and Walkways Building 2 - South Entrance Doors, Walls, Lights, Ceiling, Railing, Walkway, Ramp to Parking, and Stairs Building 2 - West Entrance Doors, Walls, Lights, Ceiling, Railing, Walkway, Ramp, and Stairs Building 11 - VA Police Main Entrance Doors, Overhang, Walls, Railing, Stairs, and Concrete Landing Building 20 - Post , Walls, Lights, Railings, Stairs, and Walkway Building 1-22 - Admin East Entrance Doors, Walkway, Stairs, Railings, Bench, Lights, and Trashcan Building 1-22 - West Entrance Doors, Walkway, Stairs, Railings, Walls, Lights, and Trashcan Building 22 - Bus Stop Benches, Bus Shelters, Trashcans, Walkways, and Curb Building 22 - North Entrance Doors, Walls, Lights, Overhang, Stairs, Walkway, Railing, Curb, Ramp, and Trashcan Building 23 - East Entrance Doors, Walls, Lights, Benches, Trashcans, Overhang, Pillars, and Walkway Building 24 - South Entrance Walkway, Ramp, Walls, Railing, Curb, and Overhang Building 36 - Veterans Courtyard Walkway, Planters, Tables, Benches, and Trashcans Building 37 - Courtyard Entrance Doors, Walls, Lights, Ceiling, Rails, Walkway, and Stairs Building 37 - Loading Dock Doors, Walls, Lights, Overhang, Railing, Walkways, and Ramps to Parking Lot Building 71 & 101 - Main Entrance Doors, Sidewalks, Walls, Benches, Overhang, Lights, and Pillars Building 100 - East Entrance Doors, Walls, Walkways, Overhang, Lights, Benches, and Pillars Building 100 - Emergency Entrance Doors, Walls, Walkways, Overhang, Railings, Curb, Benches, Trashcans, Lights, and Parking Spaces Building 100 - Main Entrance Doors, Walls, Overhang, Benches, Trashcans, Bollards, Lights, Curbs, Planter Walls, and Walkways Building 100 - Outpatient Entrance Doors, Walls, Trashcans, Benches, Walkways, Railings, Overhang, Lights, and Curbs Building 100 - Plaza Entrance Doors, Walkways, Concrete Patio Areas, Walls, Overhang, Pillars, Lights, Trashcans, Benches, Picnic Tables, Sides of Water Fountain, and Lighted Bollards Building 101 - Entrance Doors, Walkway, Overhang, Lights, Railing, Picnic Tables, Walls, and Trashcans Building 102 - Entrances ABCD (4) Doors, Overhang, Lights, Sidewalk, Walls, Benches, Picnic Tables, Bike Racks, and Trashcans Building 102 - Service Entrance Doors, Walkways, Walls, Overhang, Lights, Curbs, Railing, Bollard, and Concrete Parking Area Building 106 - Eye Clinic Entrance Doors, Glass, Benches, Walkways, Trashcans, Overhang, Walls, and Lights Building 106 - Parking Garage Entrance Doors, Walkways, Overhang, Walls, Awning Posts, and Lights Building 107 - ROC Entrance Doors, Lights, Overhang, Bollards, Walkways, and Trashcan Building 111 - Main Entrance Doors, Walkways, Concrete Pillars, Overhang, Walls, Benches, Trashcans, Planters, Bollards, Bike Racks, and Tables. Building 111 - Patio Entrance Doors, Walkways, Walls, Lights, and Planters Complete pressure washing entry areas including walkways and any sitting areas measuring approximately 155,000 SF in total to be completed 2 times per year. (every 6 months).

Get matched to contracts like this daily

Free AI-powered contract matching for your business.