The Department of Defense is procuring trailing edge components for aircraft, specifically for the B-1B. The requirement includes multiple line items such as spare parts, first articles, and compliance certificates, with a total quantity ranging from 8 to 48 units for the main item. The closing date for proposals has been extended to allow for full and open competition, with specific delivery dates set for various items.
Get your fit score, win probability, and required capabilities.
The purpose of this amendment is to withdraw the Small Business Set-Aside designation and reissues the requirement as Unrestricted. The closing date and time are extended to allow full and open competition. Synopsis PR: FD2030-26-00223 1. Estimated issue date and estimated closing/response date: Issue: Feb 2, 2026 Closes: Feb 17, 2026 2. RFP: SPRTA1-26-R-0170 3. Service/Spare/Repair/OH: Spares 4. AMC: 2/C 5. Nomenclature/Noun: TRAILING EDGE, AIRCRAFT 6. NSNs: 1560-01-607-0987 7. PN: L2400006-001 8. History: No buy history 9. Description/Function: The rear edge of the aileron, wing, elevator, rudder or other airfoil. It is that portion after the spar. DIMENTIONS, 80.0 INCH LONG BY 14.0 INCH WIDE BY 45.0 INCH TALL. WEIGHT: 100.0 LBS: MATERIAL CONTENT, Metal bonded honeycomb construction. 10. Total Line-Item Quantity: L/I 0001 – 32 Each (Range: 8 EACH - 48 EACH) L/I 0002 – 1 Each (First Article) L/I 0003 – 1 Each (First Article Test Report) L/I 0004 – 1 Each (Certificate of Compliance) 11. Application (Engine or Aircraft): B-1B 12. Destination: L/I 0001 Ship to SW3211 13. Required Delivery: L/I 0001 Ship To SW3211, On or Before
20 JAN 2027 L/I 0002 Ship To FY2303, On or Before
20 JUL 2026 L/I 0003 Ship To FA8111, On or Before
20 JUL 2026 L/I 0004 Ship To FA8111, On or Before
20 JUL 2026 14. Qualification
Requirements: Awardee must be approved by the design control activity at time of award. 15. Export Control
Get matched to contracts like this daily
Free AI-powered contract matching for your business.