The project involves maintenance dredging at Naval Submarine Base Kings Bay, Georgia, specifically for the U.S. Army Corps of Engineers. Key requirements include base work for dredging, options for additional work, and monitoring, with a total project value between $1,000,000 and $5,000,000.
The work includes maintenance dredging at specified depths, placement of dredged material at designated disposal areas, and optional additional work including bird monitoring.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govTHIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011); AHTNA Marine & Construction Company LLC (W912EP25D0012); Atlantic and Gulf Dredging & Marine LLC (W912EP25D0013); Coastal Dredging Co., Inc. (W912EP25D0014); Cottrell Contracting Corporation (W912EP25D0015); Next Generation Logistics LLC. (W912EP25D0016); Southern Dredging Co, Inc. (W912EP25D0017); Southwind Corporation Corp. (W912EP25D0018); and Waterfront Property Servies LLC Gator Services (W912EP25D0019). A Pre-Bid Conference will be held via teleconference on
27 April 2026 @ 10:00AM, EDT. Please utilize the link and call information provided below: - LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING - Meeting ID: 993 325 182 157 / PASSCODE: 85YU3Wy3 - DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 793 526 23# It is requested that an email be sent to [email protected] and [email protected] no later than
24 April 2026 at 1:00 PM, EDT to confirm attendance by your organization. DESCRIPTION OF WORK: Work is divided into a Base and three options as indicated below. For the base and dredging options, this contract incorporates two feet of allowable overdepth throughout. Base work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the
Contracting Officer. Additional Base work also includes bird monitoring and standby time. Option A Work consists of supplying additional field cut weir riser boards as requested by the
Contracting Officer. Option B Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the
Contracting Officer. Option B work also includes bird monitoring and standby time. Option C Work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work. The Request for Proposals (RFP) will be issued on or about