Closed
Save

Maintenance Dredging at Naval Submarine Base Kings Bay, Georgia - Department of Defense

Department of Defense (DoD) > U.S. Army > Engineer Division South Atlantic
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The project involves maintenance dredging at Naval Submarine Base Kings Bay, Georgia, specifically for the U.S. Army Corps of Engineers. Key requirements include base work for dredging, options for additional work, and monitoring, with a total project value between $1,000,000 and $5,000,000.

Generated 61d ago

Scope & Requirements

The work includes maintenance dredging at specified depths, placement of dredged material at designated disposal areas, and optional additional work including bird monitoring.

Evaluation Criteria

  1. Lowest Price Technical Acceptable (LPTA)

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $37M
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)
Period of Performance
305 calendar days after issuance of Notice to Proceed (NTP), including 60 calendar days to commence work.
NAICS Codes
Place of Performance
Kings Bay, Georgia, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
NAICS Size Standard
$37 million
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Engineer Division South Atlantic

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Mar 31, 2026
Last Updated2mo ago
Mar 31, 2026
Became Solicitation2mo ago
Mar 31, 2026
Tracked
Response Due2mo ago
Apr 7, 2026
RFP Issuance2mo ago
Apr 8, 2026
Pre-Bid Conference1mo ago
Apr 27, 202610:00 AM
Mandatory
Proposal Due Date27d ago
May 8, 20262:00 PM

Description

THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP25R0010: AGM Marine Contractors Inc. (W912EP25D0011); AHTNA Marine & Construction Company LLC (W912EP25D0012); Atlantic and Gulf Dredging & Marine LLC (W912EP25D0013); Coastal Dredging Co., Inc. (W912EP25D0014); Cottrell Contracting Corporation (W912EP25D0015); Next Generation Logistics LLC. (W912EP25D0016); Southern Dredging Co, Inc. (W912EP25D0017); Southwind Corporation Corp. (W912EP25D0018); and Waterfront Property Servies LLC Gator Services (W912EP25D0019). A Pre-Bid Conference will be held via teleconference on

27 April 2026 @ 10:00AM, EDT. Please utilize the link and call information provided below: - LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING - Meeting ID: 993 325 182 157 / PASSCODE: 85YU3Wy3 - DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 793 526 23# It is requested that an email be sent to [email protected] and [email protected] no later than

24 April 2026 at 1:00 PM, EDT to confirm attendance by your organization. DESCRIPTION OF WORK: Work is divided into a Base and three options as indicated below. For the base and dredging options, this contract incorporates two feet of allowable overdepth throughout. Base work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the

Contracting Officer. Additional Base work also includes bird monitoring and standby time. Option A Work consists of supplying additional field cut weir riser boards as requested by the

Contracting Officer. Option B Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the

Contracting Officer. Option B work also includes bird monitoring and standby time. Option C Work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work. The Request for Proposals (RFP) will be issued on or about

Get matched to contracts like this daily

Free AI-powered contract matching for your business.