Closed
Save

Upgrade and Replace Control Systems on Tadano LC47 and LC48 Cranes at Berth 12

Department of Defense (DoD) > Navfac Pacific Cmdnavfac Far East
TBD
est. $62K – $19M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring control system upgrades and replacement work for Tadano Infrastructure Solutions Co., Ltd. land portal cranes, LC47 and LC48 at Berth 12 in Commander Fleet Activities Yokosuka, Japan. The project includes upgrading control systems, procuring and installing replacement items, and ensuring all components meet the manufacturer's standards while maintaining safety and operational integrity.

Generated 30d ago

Scope & Requirements

The contractor will perform upgrades and replacements on the control systems of the specified cranes, ensuring compliance with safety and operational standards.

Contract Details

Contract Type
TBD
Estimated Value
est. $62K – $19M
Place of Performance
Yokosuka, Japan

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
NAVFAC PACIFIC CMDNAVFAC FAR EAST

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 5, 2026
Last Updated3mo ago
Mar 5, 2026
Became Sources Sought3mo ago
Mar 5, 2026
Tracked
Response Due2mo ago
Apr 6, 2026
Response Date2mo ago
Apr 6, 202610:30 AM
GMT+9

Description

The purpose of this procurement is to acquire control system upgrades and replacement work on land portal cranes, LC47 and LC48 at Berth 12. The upgrades and replacement work includes but is not limited to upgrading the cranes control systems. Upgrades and replacements include: • Procure and install replacement items and materials for various electrical equipment, inverters, programmable logic controllers (PLC) to include wiring connections to the replaced items, and computer software. Contractor shall be responsible for all applicable components and subcomponents to maintain accordance with the late manufacturer’s standard. • Inspection for all applicable components and sub-components for conditions, cleanliness, damage, defects, deterioration, corrosion, proper operating record to load/unload for applicable capacities, electrical connections, and the locations/positions correction as required, and verify the equipment location is free of debris and/or flammable material, during and/or end of the work scheduled daily and the completion of the work. Validation is required for the designated crane conditions and applicable capacities upon the receipt of task orders. Note: The Contractor shall record all operated works specifications and results, and submit it per SOW. Upon completion of above on-site works, put systems back to normal operation and check to ensure that equipment and systems are operating properly. Validate the operation/work entire area for the task order, and ensure all applicable power on/off device, on/off method, and positioned correctly before and after performing the work is the high priority for the Contractor protection in performance safety, and the site personnel/property safety. Toshiki Hisasue Contracting (No Street Address

2) FPO, AP 96349-0013 USA to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.