Replace Roofs on Buildings 1, 52, and 53

Veterans Affairs (VA)Sol: 36C25526R0041

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Value
Similar contracts award $25K$400K (median $99K, 73,582 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Response Due4mo ago
Feb 9, 2026
Published24d ago
May 11, 2026
Became Presolicitation23d ago
May 11, 2026
Tracked
Last Updated22d ago
May 13, 2026

Description

The primary

objective of this project is the replacement of the existing roofs on Buildings 1, 52, and 53 at the St. Louis Medical Center, Jefferson Barracks. This roof replacement project is intended to rectify deficiencies identified in the current Facility Condition Assessment (FCA) Report (#77963, #78376, and #78408). The goal is to implement the roofing solution generated by the AE to ensure the Medical Center is able to continue to operate and deliver a high standard of care to veterans for years to come. Building 1 (FCA # 77963): The area of existing roofing needing replacement equals approximately 30,000 square feet. The existing roof membrane is on an elevated wood framed platform and is nearing the end of the expected life of the roof. Building 52 (FCA # 78376): The area of existing roofing needing replacement equals approximately 35,000 square feet. The existing built-up roof with reflective slurry mop has a large quantity of cracks and is nearing the end of the expected life of the roof. Building 53 (FCA # 78408): The area of existing roofing needing replacement equals approximately 24,500 square feet. The existing built-up roof with reflective slurry mop has a large quantity of cracks and is nearing the end of the expected life of the roof. For all three buildings, the

scope of work will include: Complete demolition and removal of the existing roofing systems, per the specifications and construction documents parameters. Installation of new roofing components, per the specifications and construction documents parameters. Generally, this will include roof deck insulation & new membrane systems, and any supporting components required to meet contract documents and potential necessary requests from St. Louis VA Medical Center, Jefferson Barracks during construction to account for differing site conditions. Note: Contractor to abide by all work &

requirements set in the final release for construction project drawings and specifications. Project shall conform to all Records Management and Privacy Language. The

period of performance for this project will be 365 days after NTP issue date. Kevin M Farrell to this opportunity. S02 ARA RM Contract Language Clause 3 PGS.pdf S02 -Privacy Language 4 PGS.pdf S02 ATCH 1_NARA RM Contract Language Clause 3 PGS.pdf P09 - Drawings 31 PGS.pdf P09-657-24-110JB_CONST_100PCT_Specifications - for bidding 272 PGS.pdf