The Department of Defense is procuring the construction of a Relay Ground Station-South (RGS-S) at Schriever Space Force Base. The project involves designing, building, and installing various components including concrete pads, antenna pedestals, radomes, site utilities, backup generators, and shelters.

Generated 57d ago

Scope & Requirements

The scope of work includes designing, procuring, installing, and commissioning a complete and usable facility with components such as concrete pads, antenna pedestals, radomes, site utilities, backup generators, and shelters.

Deliverables

  • Concrete pads
  • Antenna pedestal foundations and radome ringwalls
  • Site utilities, pathways, and cabling
  • Backup generators and fuel tanks
  • Shelters

Contract Details

Contract Type
Design-Build
Estimated Value
est. $5.0M – $45M
Similar contracts award $15K$364K (median $63K, 1,815 awards)Above typical range
NAICS Codes
Place of Performance
Schriever Space Force Base, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Northwestern Endist Omaha

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Feb 27, 2026
Last Updated3mo ago
Feb 27, 2026
Became Sources Sought3mo ago
Feb 27, 2026
Tracked
Response Due3mo ago
Mar 13, 2026
Response Date3mo ago
Mar 16, 202611:00 AM
MDT

Description

This project is a Design-Build contract to support the Space Development Agency (SDA) by constructing a Relay Ground Station-South (RGS-S) at Schriever Space Force Base. The purpose is to provide the necessary facilities and infrastructure to support the RGS-S mission within a restricted area. The

scope of work requires the contractor to design, procure, install, and commission a complete and usable facility. The primary components of the project include: Concrete pads Antenna pedestal foundations and radome ringwalls Site utilities, pathways, and cabling Backup generators and fuel tanks Shelters Brian Reynolds Alternative