Closed
Save

Ehrm Infrastructure Upgrades In Asheville, Nc

Veterans Affairs (VA)
SDVOSB

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Awarded Amount
Similar contracts award $25K$400K (median $99K, 73,582 awards)
NAICS Codes
Set-Asides
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published13d ago
May 22, 2026
Last Updated13d ago
May 22, 2026
Became Award Notice12d ago
May 22, 2026
Tracked
Response Due8d ago
May 27, 2026

Description

The contractor shall provide all tools, equipment, materials, labor, supervision, and management to complete the construction of infrastructure upgrades to the campus. Construction practices shall comply with all VA solicitation drawings and specifications, VA regulations, procedures, and conditions for work at the medical center and any applicable codes as per

requirements of all governing agencies. Work includes, but is not limited to, electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, asses for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes, cable), Renovation Datacenter work (HVAC, UPS, Power distribution, cable management, expansion of space, fire suppression, finishes), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project buildings include: Buildings 47, 62, 14, 15, 9, 7, 6, 5, 4, 3, 2, 73, 70, 11, 12 and site. Contractor shall complete the intent of project 637-22-700 in strict accordance with the drawings and specifications. All work not specifically identified by the drawings and/or specifications but necessary for a complete system shall be included as if specifically identified in the Contract Documents. Andrew Mathews Alternative

Point of Contact Scott Elias to this opportunity. Attachment 12 - Wage Determination.pdf Attachment 13 - Site Visit Details.pdf Attachment 10 -

Key Personnel.docx Attachment 9 - Key Subcontractor Information.docx Attachment 11 - Division

Pricing Template.xlsx Attachment 8 - Limitations on Subcontracting - Construction.docx Attachment 7 - Drawings Volume VI.pdf Attachment 6 - Drawings Volume V.pdf Attachment 5 - Drawings Volume IV.pdf Attachment 4 - Drawings Volume III.pdf Attachment 3 - Drawings Volume II.pdf Attachment 2 - Drawings Volume I.pdf Attachment 1 - Specifications.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.