The Department of Interior, Bureau of Land Management (BLM) is procuring the installation of a 380-foot stock water pipeline with four hydrants and integration of a storage tank in Prairie County, Montana. The project includes connecting the pipeline to an existing well and a BLM-provided storage tank.
The contractor will install a 380-foot stock water pipeline with four hydrants and integrate it with an existing well and a BLM-provided storage tank.
he Department of Interior, Bureau of Land Management (BLM), Montana State ,380¿foot stock water pipeline with four (4) hydrants and integration of a storage tank. This project has an existing water well and a BLM provided storage tank. The contractor will furnish all labor, equipment, supplies, and materials necessary to install the pipeline, connect it to the existing well, and the BLM storage tank. The project located in Prairie County, Montana. The work location is shown in the drawings.PROCUREMENT OVERVIEWTYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award ContractTYPE OF CONSTRUCTION: HeavyNAICS CODE: 238990, All Other Specialty Trade ContractorsMAGNITUDE: Between $25,000 and $100,000RESTRICTIONS ON CONTACTS: Beginning upon release of the request for quote (RFQ) through contract award, contacting Government employees who may be associated with this work by participating quoter on the subject of this RFQ is inappropriate. Quoters for this RFQ, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the Contract Specialist listed below:Bureau of Land ManagementAttn: Jorge AlvarezPhone: (854) 500-1840Email: [email protected] SITE VISIT: The Government strongly urges quoters to inspect the site to gain a better understanding of the work
requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.See Section L, Clause 52.236-27 ¿ Alternate I, Site Visit (Construction) ¿ Alternate I for more information.
7 April 2026 at 1:00 pm, Mountain Time.
Questions submitted after this date and time will be accepted but may not be answered. All
questions must be submitted in writing via e-mail to Jorge Alvarez. See Section L, Paragraph L.12, Submittal of