Bowling Center And Food And Beverage Upgrades

Department of Defense (DoD)Sol: NAVMWR-26-R-0038

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Awarded Amount
Similar contracts award $25K to $402K (median $99K, 70,896 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published1mo ago
Jun 16, 2026
Became Solicitation1mo ago
Jun 16, 2026
Tracked
Became Award Notice1mo ago
Jun 16, 2026
Tracked
Last Updated1mo ago
Jun 18, 2026
Response Due17d ago
Jul 7, 2026

Description

The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg.

485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the

Contracting Officer’s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and

requirements. The Contractor shall refer to Section H for additional information regarding design

submittal

requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP. Nika Maldonado,