The Department of Defense is procuring control assemblies for use in critical shipboard systems, emphasizing the need for high-quality materials to prevent failures that could lead to serious consequences. The procurement includes specific requirements for material certification and compliance with safety standards.
Get your fit score, win probability, and required capabilities.
|4|N743.24|WWJ|N/A|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|See sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|N50286|TBD|N/A|N/A|TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS MECH| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year. |365 days after date of last delivery.||||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|One|0001|30||See DD1423|TBD|||X|| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEV 2026-O0037)(FEB 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| EVALUATION OF FIRST ARTICLE TESTING|3|||X| 1. DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already onfile at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3. The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 18 working days after receipt Final delivery of material (210 days) 4. If drawings are associated with the solicitation, access needs to be requested on the individual solicitation page under Contract Opportunities on SAM.gov website. After requesting access, send an email to the POC listed on the solicitation. 5. Any contract awarded as a result of this solicitation will be DO certified for national defense under the Defense Priorities and Allocations System (DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;B; applies to this material. 1.1.2 This ;Cable Assembly; contains non-metallic materials which must satisfy the toxicity and flammability
requirements of NAVSEA ;SS800-AG-MAN-010/P-9290; . Use of any material other than that specified requires special engineering approval and may require testing. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.2.3 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. DRAWING DATA=5486641 |53711| L|DW |D| | | | DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |230223|A| |01| DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-DTL-24231 |0004| |E |240513|A|1 | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| DOCUMENT REF DATA=S9320-AM-PRO-020/MLDG | | |3 |200716|D| | | DOCUMENT REF DATA=S9320-AM-PRO-030/MLDG | | |3 |051201|A| | | 3.
REQUIREMENTS 3.1 ;The Cable Assembly must be manufactured in accordance with NAVSEA drawing 5486641 Item 201, Part Number C-1SD/K-NC1004, except as modified or amplified herein.; 3.2 ;This contract requires the use of MIL-DTL-24231 and its slash sheets in lieu of MIL-C-24231.; 3.3 ;Drawing 7329665 does not apply.; 3.4 Prior to molding, MIL-DTL-24231 connector plug bodies must be treated with a Non-Conductive Coating (NCC) plasma spray in accordance with NAVSEA S9320-AM-PRO-030/MLDG by an approved vendor listed in CSD024 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.4.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.5 The cable assembly must be wired and molded in accordance with volume II of NAVSEA S9320-AM-PRO-020/MLDG by an approved vendor listed in CSD023 of the ECDS (Electronic Contractor Data Submission) system at: https://register.nslc.navy.mil/ 3.5.1 The approved vendor utilized for this contract, if other than the prime manufacturer, must be identified on the Special Emphasis C of C. 3.6 Quality Conformance Tests - Each Cable assembly must be subjected to Quality conformance tests per MIL-DTL-24231 Type 1 with the following exceptions: (Certificate of Compliance only) A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; +5%/-0% PSI for both the three cycle test and 2 hour test. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;1250; V AC. 3.7 First Article Test (Contractor): One complete Cable assembly must be subjected to First Article Tests per MIL-DTL-24231 type 1 and the following: A) The hydrostatic pressure test must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231 at ;135; PSI. B) The Insulation resistance check must be per SS800-AG-MAN-010/P-9290 Appendix M and MIL-DTL-24231. C) A dielectric test is required per SS800-AG-MAN-010/P-9290 paragraph 3.6.3.5 Electrical Testing and MIL-DTL-24231 at ;1250; V AC. 3.8 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.8.1 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.9 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.10 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.10.1 Waivers/Deviations - All waivers and deviations, regardless of significance or require review and approval by the
Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.10.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.10.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the
requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE
REQUIREMENTS ^ 3.12 Quality System
Get matched to contracts like this daily
Free AI-powered contract matching for your business.