This opportunity is closed. Review the award details to understand pricing and competitors for future similar contracts.
Please review the Performance Work Statement (PWS) for details. The contractor is required to have a CMMC Level 2 (SELF) to be consider The Requirement is not an inherently government function. Repair effort is deemed performance based. Critical Safety Item (CSI) does not apply to this PI. Requirement restricted to qualified source(s). All non-qualified vendors that submit a proposal in support of this requirement must comply with qualification
requirements found in clause 52.209-1, and the source qualification statement attached hereto, in order to be considered for award. Award shall not be delayed to qualify new sources. For the end item, the contractor shall furnish all facilities, parts, materials, equipment and services, required to inspect and, if necessary, restore to serviceable condition. Services to be performed will not be essential in a crisis situation. Work consists of one of two efforts: Test, teardown, and evaluation (TT&E) only or TT&E and repair.NSN: Item Description: POWER SUPPLY Part Number: 7326396G002 Quantity: 17 EA RFQ/RFP Return Date: Copy Note: RESTRICTED TO PREQUALIFIED SOURCESQualification
Requirements: See FAR Part 52.209-1 The
requirements of FAR 9.202(a) apply. Sources must be qualified prior to being considered for award. Interested vendors that have not been previously approved for this acquisition must submit a Source Approval Request (SAR) package to the Source Development Small Business . As prescribed in FAR 9.202(e), the
contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification in the attached Repair Qualification
Requirements (section C document). If requesting access to the technical data package (TDP), please with a current copy of your DD2345 and JCP printout. This part requires engineering source approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source(s). An alternate source must qualify in accordance with the design control activity's procedures as approved by the cognizant Government engineering activity. ABOVE CLIN 0001 ACO AUTHORITY AND RESPONSIBILITIES:
Get matched to contracts like this daily
Free AI-powered contract matching for your business.