The response deadline has passed. Review the details for future reference or to track similar opportunities.
The U.S. Army Corps of Engineers is procuring the turbine replacement and generator rewind (TRGR) at John Day Dam. Key requirements include technical specifications, drawings, and a phased proposal process.
The scope of work involves the replacement of turbines and rewinding of generators at John Day Dam.
03/27/2026: Amendment 1 is attached. 02/24/2026: Amendment 1 remains forthcoming and is expected to be published in the coming week. This amendment will formally extend the phase 1 proposal due date to Friday, 04/03/2026, as well as provide some revisions to technical information. Phase 1 proposal instructions and
evaluation criteria remain unchanged through amendment 1. Additionally, this project was solicited before the 02/01/2026 effective date for the Department of War's adoption of the Revolutionary FAR Overhaul (RFO), therefore, no revisions to the solicitation to adopt the RFO are required, or planned. 01/09/2026: The Phase 1 solicitation package, which includes the phase 1 solicitation with specifications, solicitation drawings, reference drawings, bid schedule, and brand name justification, is attached. Amendment 1 is anticipated to be issued on or before 02/25/2026. Upon issuance of Amendment 1, the Government intends to extend the Phase 1 solicitation closing date by approximately one month. The official revised closing date and time will be posted on SAM.gov. Aragon Liebzeit Alternative
Point of Contact Mitchell Johnson to this opportunity. 7N26RA003 TRGR Amendment 1.pdf 7N26RA003 TRGR Phase 1 Solicitation.pdf 7N26RA003 TRGR Phase 1 Solicitation Drawings.pdf 7N26RA003 TRGR Phase 1 Reference Drawings.pdf 7N26RA003 TRGR Phase 2 Bid Schedule.xlsx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.