Closed
Save

4-Foot Gage Plate for Inspection and Valuation

Department of Defense (DoD) > U.S. Navy > NAVSUP WSS MechanicsburgSol: N0010426QAA95

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a 4 FT Gage Plate for machinery manufacturing. The procurement is a total small business set-aside with a closing date extended to COB, 10 MAR 2026.

Generated 57d ago

Scope & Requirements

Manufacture of the 4 FT Gage Plate for machinery manufacturing.

Deliverables

  • 4 FT Gage Plate

Contract Details

Estimated Value
Not specified
Similar contracts award $460$16K (median $3K, 19,481 awards)
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
Certifications
  • Annual Representations and Certifications (OCT 2025)
  • Annual Representations and Certifications (MAR 2025)
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE NAVY
Office
NAVSUP WSS Mechanicsburg

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

RFQ Closing Date3mo ago
Mar 10, 2026COB
Published2mo ago
Mar 27, 2026
Last Updated2mo ago
Mar 27, 2026
Response Due1mo ago
Apr 27, 2026

Description

|4|N97113A|FBA|771-229-0509|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE

CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|332510|600|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| RFQ closing date has been extended until COB,

24 APR 2026. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. RFQ closing date has been extended until, COB

10 MAR 2026. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electrocommercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. TO VIEW THE DRAWINGS: Go to www.https://www.sam.gov Click: Contract Opportunities and enter the solicitation number. This gives you access to the Electronic Solicitation. Drawings can be viewed or downloaded. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY_______________DAYS. THIS SOLICITATION CONTAINS MULTIPLE CLINS; THEREFORE AWARD WILL BE BASED ONTOTAL DOLLAR VALUE AND NOT INDIVIDUAL UNIT PRICE. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. 1. SCOPE 1.1 This contract/purchase order contains the

requirements for manufacture of the 8 FT GAGE PLATE . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 2.1.3 The "Document Changes" section provides supersessions/changes to referenced documents. 2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the drawings shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. DRAWING DATA=7123532 |53711| L| |D| | | | DRAWING DATA=8971563 |53711| -|DW |D| | | | 3.

REQUIREMENTS 3.1 Manufacturing and Design - The 8 FT GAGE PLATE furnished under this contract/purchase order shall meet the material and physical

Get matched to contracts like this daily

Free AI-powered contract matching for your business.