Installation of Electrical Outlets in Building 504

Department of Defense (DoD)

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Contract Details

Awarded Amount
Similar contracts award $13K to $139K (median $39K, 9,267 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published12d ago
Jul 13, 2026
Last Updated12d ago
Jul 13, 2026
Became Award Notice11d ago
Jul 13, 2026
Tracked
Response Due2d ago
Jul 23, 2026

Description

The contractor is responsible for delivering all materials, labor, tools, equipment, transportation, and supervision required to complete the installation in a single phase to minimize facility downtime. All design and construction must comply with Laughlin AFB Division 01 Specifications, Environmental Contractor Technical Specifications, UFC 1-200-01 (DoD Building Code), and NFPA 70 (National Electrical Code). The technical execution requires a Stormwater Pollution Prevention Plan (SWPPP) to manage runoff and eliminate Foreign Object Debris (FOD). Physical works include trenching from the transformer to a distribution rack positioned ten feet behind it, followed by running 160 feet of overhead power lines on three newly installed utility poles (Poles #1, #2, and #3) to B504. These utility poles must not exceed the 28-foot height of the neighboring B502. Hydro trenching is restricted to a ten-foot stretch from the transformer to the rack and a three-foot diameter around each utility pole. The electrical infrastructure demands 180 feet of 2 ½ inch conduit and properly sized wiring to support six 480-volt weatherproof twist-lock receptacles, complete with dedicated disconnect switches, system grounding, and bonding. The contractor must also coordinate secondary power conduit termination with the Rio Grande Electric Cooperative (RGEC) and assume all associated subcontracting costs. Following installation, the site must be restored, graded, and cleared of rocks larger than three inches. Site visit will be scheduled for

13 July 2026 at 2:00 pm. If you have any

questions direct them to the primary

point of contacts email. All

questions, comments and inquiries will be returned to all those parties that submitted quotes. All quotes must include all costs associated with engineering design, labor, tools, equipment, materials, transportation, installation, testing, and site restoration. All quotes must be accompanied by technical specification sheets for all proposed hardware. ALL QUOTES MUST BE ON COMPANY LETTERHEAD ALL QUOTES MUST REMAIN VALID UNTIL

30 SEPTEMBER 2026 Vendors shall provide: - Itemized

Get matched to contracts like this daily