Quick Brief

The Department of Defense is procuring maintenance dredging services for Ludington Harbor and Pentwater Harbor. The work includes mobilization, dredging between specified limits, placement of dredged material, and demobilization, with potential re-mobilization in 2027 if options are exercised. Contractors must follow the specifications outlined in the contract drawings and adhere to the U.S. Army Corps of Engineers guidelines for equitable adjustments.

Generated 30d ago

Scope & Requirements

The project involves maintenance dredging at Ludington and Pentwater Harbors, including mobilization, dredging, and placement of dredged materials as per contract specifications.

Contract Details

Contract Typei
FFP
Awarded Amount
est. $5.0M – $45M
Similar contracts award $44K$1.1M (median $203K, 8,719 awards)Above typical range
NAICS Codes
Place of Performance
Ludington

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Engineer Division Great Lakes and Ohio River District Detroit

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 11, 2026
Last Updated3mo ago
Mar 11, 2026
Became Award Notice3mo ago
Mar 11, 2026
Tracked
Response Due2mo ago
Apr 10, 2026

Description

Amendment 0001 is issued to provide revised Plan Sheets CN101 and CN102.

Reference amendment documents for full details.FY25 Ludington and Pentwater Maintenance Dredging.

Mobilize to Ludington Harbor and Pentwater Harbor and dredge between the upstream and downstream limits as shown on the contract drawings.

Place dredged material at respective placement sites pertaining to each harbor, as outlined in the contract drawings and specifications.

If applicable option(s) are exercised, re-mobilize to Pentwater Harbor in 2027 and dredge between the upstream and downstream limits as shown on the contract drawings.

Upon completion of the work, clean-up and demobilize from the harbors.