The U.S. Air Force is procuring the design, demolition, and replacement of the roof for Building 1130 at Shaw Air Force Base in Sumter, South Carolina, under a 100% small business set-aside, requiring compliance with a detailed Statement of Work and mandatory site visit attendance for prime contractors.
Get your fit score, win probability, and required capabilities.
Design, demolition, and replacement of the roof for AFCENT Headquarters Building 1130 at Shaw Air Force Base in accordance with the Statement of Work dated 28 February 2026.
Project Title: B1130 Roof Replacement Project Location: Shaw AFB. This is a construction requirement for the design, demolition, and replacement of the roof for the AFCENT Headquarters building 1130 in accordance with the attached Statement of Work dated
28 February 2026.
Period of Performance: 293 Calendar Days after Notice to Proceed issuance. Competition: This requirement is a 100% Small Business Concern Set Aside for North American Industry System (NAICS) code 238160. The Magnitude of this requirement in accordance with Federal Acquisition Regulation (FAR) 36.204(F) is valued between $1,000,000.00 and $5,000,000.00. A site visit is scheduled on
30 April 2026 / 10:00 A.M. (local) EST. Site visit location is at Building 1130, at 524 Shaw Dr, Sumter, SC 29154. SITE VISIT ATTENDANCE FOR PRIME CONTRACTORS COMPETING FOR AWARD IS MANDATORY! Please refer to
attachments 16 through 18 to ensure to adhere to all
requirements necessary to obtain a pass to access the installation. Escorts will NOT be provided. All
Get matched to contracts like this daily
Free AI-powered contract matching for your business.