The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is seeking the fabrication of nickel aluminum bronze devices for the United States Navy submarine propulsors, categorized into Regular and Large configurations. The Advanced Propulsor Management Office requires potential offerors to demonstrate their capability to meet the requirements and schedule, while also providing feedback on draft documents related to the solicitation. The planned release of the Request for Proposal is expected by the end of July 2026, with an anticipated award date in January 2027.
A REQUEST FOR PROPOSAL (RFP) BUT INSTEAD A SYNOPSIS ACCORDING TO FAR 5.2- AWARD OF A CONTRACT WILL NOT BE MADE AS A RESULT OF THIS NOTICE. ADDTIONALLY, CONTRACTORS WILL NOT BE COMPENSATED FOR COSTS RELATED TO RESPONSE PREPARATION AND/OR SUBMITTAL. The Advanced Propulsor Management Office (APMO) (Code
808) in the Naval Architecture and Engineering Department (Code
80) of the Naval Surface Warfare Center, Carderock Division (NSWCCD) is responsible for managing the manufacture and delivery of United States Navy submarine propulsors. The APMO requires the fabrication of nickel aluminum bronze (NAB) devices in multiple configurations . Device piece parts are classified into two categories: Regular and Large. The Regular category encompasses several configurations, as defined in References 2.1 through 2.4. The Large category is delineated in References 2.5 through 2.10 Included with this notice is a Draft Statement of Work (SOW) and Draft Sections L&M of the Solicitation. The draft documents are being provided to request comments, recommendations, and
questions from potential offerors. The Government will award this action as a Commercial Buy under FAR Part 15 due to the inclusion of Engineering Services. As part of the response, the offerors at a minimum shall: 1. Demonstrate the capability to meet the
requirements and schedule 2. Inform the Government if barriers exist that would not allow for the offeror to propose The response is limited to ten pages Please note the no Government response will be provided to
questions/comments submitted in response to this notice and respondents will NOT be notified of the results of the synopsis. All
Get matched to contracts like this daily
Free AI-powered contract matching for your business.