ActiveOpen for Bids
Save

Multiple Award Task Order Contract for Design-Build and Design-Bid-Build Construction

Department of Defense (DoD)
FFP
$44K – $1.1M per task order
Quick Brief

The Department of Defense is procuring a Multiple Award Task Order Contract (MATOC) for design-build and design-bid-build construction services across the Northwestern Division, which includes the Portland, Seattle, and Walla Walla Districts. The contract has an estimated total capacity of $99,000,000 over a five-year base period and aims to consolidate various stand-alone contracts for repair, maintenance, and construction services related to civil works projects. This procurement is set aside for small businesses, with multiple awards anticipated and task order sizes ranging from $1.5M to $10M.

Generated 8d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work includes flood control and hydroelectric dams, river navigation facilities, maintenance of roadways and recreation facilities, and river levees across three districts.

Contract Details

Contract Typei
FFP
Contract Vehicle
MATOC
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $99M, 3 awardees
Similar contracts award $44K to $1.1M (median $204K, 8,310 awards)
Period of Performance
5 years
Expected Awards
3
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside
NAICS Size Standard
$41.5M

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published9d ago
Jul 16, 2026
Last Updated9d ago
Jul 16, 2026
Became Solicitation8d ago
Jul 16, 2026
Tracked
Response Date2d ago
Jul 23, 202608:00 AM PDT
Response Duein 6d
Jul 31, 2026
Anticipated Solicitation Datein 7d
Aug 1, 2026

Description

In accordance with FAR 7.107-3 and 15 U.S.C. § 657q, the U.S. Army Corps of Engineers, Portland District, provides public notice of its determination to consolidate contract

requirements for design-build and design-bid-build construction services across the Northwestern Division (Portland, Seattle, and Walla Walla Districts). Consolidation Determination: The

Contracting Officer has determined that consolidation of these

requirements is necessary and justified in accordance with FAR 7.107-2. The consolidation will establish a single Multiple Award Task Order Contract (MATOC) with an estimated total capacity of $99,000,000 over a five-year base period.

Requirements Being Consolidated: This consolidation will replace various stand-alone contracts previously awarded for repair and maintenance of real property and construction services, including new construction and renovation to large civil works projects. Work includes flood control and hydroelectric dams, river navigation facilities, maintenance and , roadways and recreation facilities, and river levees across three districts. Anticipated Benefits: The quantified benefits of consolidation total $17,584,365 (17.8% of contract value), substantially exceeding the FAR 7.107-2(d)(1)(ii) threshold of $9.4M. Benefits include: • Procurement cost savings: $1,116,265 (56% reduction vs. stand-alone contracts) • Revenue protection: $15,668,100 (140-day PALT reduction protecting hydropower generation) • Administrative efficiency: $800,000 (reduced overhead for 1 MATOC vs. 25 stand-alone contracts) Small Business Considerations: This procurement constitutes substantial bundling under FAR 2.101 (total value exceeds $8M threshold). The agency has assessed barriers to small business participation and determined they are minimal and adequately mitigated through: • Total Small Business Set-Aside (100% of contract value reserved for small business) • Multiple awards (3-5 contractors) • Reasonable task order sizing ($1.5M-$10M, within NAICS 237990 size standard) • Minimum guarantees ($3,000 per awardee) • Teaming provisions (FAR 52.207-6) Market research identified 18 capable small businesses, and 5 historical MATOCs successfully utilized small business pools for identical scope. Consolidation Determination and Findings: The complete Consolidation Determination and Findings memorandum is available upon request. is provided below. Anticipated Solicitation Date: August 2026

Point of Contact: Andrew Sprys, Contract Specialist U.S. Army Corps of Engineers, Portland District Email: [email protected] Phone: 503-248-6839 Public Comment Period: Interested parties may submit comments regarding this consolidation determination. Comments should be submitted to the

Get matched to contracts like this daily

Free AI-powered contract matching for your business.