The response deadline has passed. Review the details for future reference or to track similar opportunities.
The contract is for the design-build of a heating system optimization at the Bismarck Municipal Airport Air Traffic Control Tower in Bismarck, ND. The award has been made by the Department of Transportation, specifically the Federal Aviation Administration. The incumbent contractor is The Matthews Group, Inc.
The work involves optimizing the heating system for the Air Traffic Control Tower at the Bismarck Municipal Airport.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.govPoint of Contact Linda Hennequant Contracting -500, FAA SW REGIONAL , TX 76177 USA to this opportunity.
Get matched to contracts like this daily
Free AI-powered contract matching for your business.