The Department of Defense is procuring roofing repair services for Building 155 at Columbus Air Force Base. The contractor will be responsible for the complete design and replacement of the roof, ensuring it meets specific insulation and waterproofing requirements. Key tasks include replacing built-up roof components, insulation, and related systems while adhering to all relevant Air Force codes and standards.
Get your fit score, win probability, and required capabilities.
The contractor will perform the design and replacement of the roof for Building 155, ensuring it is insulated and waterproofed to prevent leaks. The project includes replacing various roofing components and adhering to Air Force standards.
Update to Amendment 1: Added amended solicitation to attacnment section. AMENDMENT 1: The purpose of this amendment is to change the site visit date, RFI due date, the proposal due date, and revised "Safeguarding Controlled Unclassified Information (CUI) acknowledgment". _________________________________________________________________________________________________________ NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire design and replacement of the roof of building 155, replace the overhang covering the exhaust louver on the rear of the facility, and the overhang covering the entrance and roll up door on the front of the facility. The new roof and overhands shall eliminate every weather borne water leak into B155. The new roof shall be free from ponding. The new roof shall be insulated meeting ASHRAE zoning
requirements for the facility. The new roof shall be a TPO single ply membrane roofing system. The work shall include but is not limited to: replacement of built up roof components down to roof decking, insulation, gutter system including downspouts, roof curbing, and roof coping. Perform all work according to this Statement of Work (SOW) and all related AF
requirements and other codes and references. Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on
04 June 2026 at 9:00 AM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 1:00 PM CST on
26 May 2026. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov
attachments). If you do not contact the POC by 1:00 PM CST on
Get matched to contracts like this daily
Free AI-powered contract matching for your business.