Replace Boiler in Building 221

Department of Defense (DoD) > U.S. Air Force > 911th Airlift Wing, Air Reserve Station (ARS)
Firm-Fixed Price (FFP)
$13K – $126K per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The 911th Airlift Wing, Air Reserve Station (ARS) is replacing the boiler system in Building 221 in Coraopolis, PA. The project includes removing the existing boiler, installing a two-boiler redundant system, and providing temporary heating.

Generated 57d ago

Scope & Requirements

Remove the existing boiler, install a two-boiler redundant system, replace hydronic piping, modify concrete pad, and provide temporary heating.

Deliverables

  • Removal of existing boiler
  • Installation of two-boiler redundant system
  • Replacement of hydronic piping
  • Modification of concrete pad
  • Temporary heating system capable of maintaining 69 degrees Fahrenheit
  • Daily monitoring of temporary heating system

Contract Details

Contract Type
Firm-Fixed Price (FFP)
Contract Vehicle
Request for Quote (RFQ)
Contract Value
$13K – $126K per task order
IDIQ ceiling: $19M
Similar contracts award $13K$126K (median $35K, 14,862 awards)
NAICS Codes
Place of Performance
Coraopolis, PA, USA

Qualifications & Eligibility

Set-Aside Category
Small Business
NAICS Size Standard
$19 Million
Required Registrations
  • System for Award Management (SAM)

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Air Force Reserve Command
Office
911th Airlift Wing, Air Reserve Station (ARS)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 20, 2026
Last Updated3mo ago
Mar 20, 2026
Response Due2mo ago
Apr 4, 2026

Description

The purpose of this amendment is to incorporate the answers to RFIs as attachment 6.

The 911th Airlift Wing, Air Reserve Station (ARS) has a project to replace the boiler system in Building 221 in Coraopolis, PA.

General Information: This project involves the removal of an existing boiler at Building 221 and its replacement with a two-boiler redundant system, as well as providing temporary heating for Building 221.

The project scope includes the replacement of all hydronic piping, in mechanical room area, with associated equipment and insulation, as well as the demolition and replacement of the existing flue to ensure compatibility with the new boilers.

It also requires disconnecting the existing gas piping, power, and control wiring, and the installation of new or replacement components for those systems.

Modify concrete pad to accommodate new boilers.