Closed
Save

HH-60W Degraded Visual Environment System Modification

Department of Defense (DoD)Sol: FA855226RB001
est. $15M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring the HH-60W Degraded Visual Environment System (DVES) for the United States Air Force to enhance aircraft safety in degraded visual environments. The system will provide real-time hazard detection and must be capable of functioning in various conditions such as smoke, snow, and dust. The contract includes design, development, testing, and installation of the DVES kits over a potential period of performance of up to eight years.

Generated 13d ago

Scope & Requirements

The contract involves the development and installation of a system to enhance the safety of the HH-60W helicopter in degraded visual environments.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $15M – $45M
Similar contracts award $282 to $9K (median $1K, 59,572 awards)Above typical range
Period of Performance
8 years
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published15d ago
Jul 10, 2026
Response Date15d ago
Jul 10, 202614:00
Response Due14d ago
Jul 10, 2026
Became Solicitation14d ago
Jul 10, 2026
Tracked
Last Updated13d ago
Jul 12, 2026

Description

The United States Air Force (USAF) has a need to field a system capable of addressing the issues posed by Degraded Visual Environments (DVE). The HH-60W DVES solution shall provide real-time hazard detection in both enroute and terminal areas, displaying this information clearly on cockpit and cabin displays. It shall be designed to function effectively in a variety of DVE, including those created by ambient/aritificial conditions such as smoke, smog, snow, night sand/dust, etc and aircraft-induced conditions such as brownout/whiteout. This effort will consist of the material solution and all non-recurring engineering required to install a DVE solution on to the HH-60W Jolly Green II helicopter, including the design, development, testing, integration, procurement, installation, and deployment of the DVES kits. Anticipated Contract

Period of Performance: One (1) base period of twenty-four (24) months with One (1) Ordering Period and One (1) Option to turn on Ordering Periods 2-6. This establishes an total potential

period of performance of eight (8) years. Theresa Younce, Contract Specialist Alternative

Point of Contact Millie Danko,

Contracting Officer to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.