Closed
Save

NASA Wallops Beach Renourishment Project in Virginia - Department of Defense

Department of Defense (DoD) > U.S. Army > Norfolk District
8(a)HUBZoneSDVOSBfirm-fixed-price
$44K – $1.1M per task order

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The NASA Wallops Beach Renourishment Project involves beach nourishment at Wallops Island, Virginia, specifically using dredged material from Unnamed Shoal 'A'. The U.S. Army Corps of Engineers is seeking firms capable of performing this construction work, which includes dredging, transporting, and placing material along the beach, with an estimated construction price range of $10,000,000 to $25,000,000.

Generated 61d ago

Scope & Requirements

The project includes dredging to a maximum depth of seven feet, transporting dredged material to Wallops Island, and placing it along the beach, with a total estimated volume of 1,500,000 to 2,500,000 cubic yards.

Contract Details

Contract Type
firm-fixed-price
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $25M
Similar contracts award $44K$1.1M (median $204K, 8,719 awards)
estimated construction price range
Period of Performance
approximately 325 calendar days from issuance of the NTP
NAICS Codes
Place of Performance
Wallops Island, Virginia, USA
Set-Asides
8(a), HUBZone, SDVOSB

Qualifications & Eligibility

Past Performance
similar jobs within the past 5 years

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
U.S. Army Corps of Engineers
Office
Norfolk District

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 12, 2026
Last Updated3mo ago
Mar 12, 2026
Became Solicitation3mo ago
Mar 12, 2026
Tracked
Response Date2mo ago
Mar 25, 202614:00
Response Due2mo ago
Apr 13, 2026

Description

The U.S. Army Corps of Engineers – Norfolk District is seeking eligible firms capable of performing beach nourishment at Wallops Island, VA. The work will be completed via hopper dredge while using the Unnamed Shoal “A” as the borrow source. More specifically, dredging will be permitted to a maximum depth of seven (7) feet below existing bottom within the borrow area. Existing bottom depths within the borrow source range between -34 ft NAVD88 and -60 ft NAVD88 based upon location. Dredged material generated by the project shall be transported and placed along the beach at Wallops Island. The borrow site will be located approximately eleven (11) miles from the placement site. Replenishment of the beach is estimated to require 1,500,000 to 2,500,000 cubic yards of pay volume and the Contractor shall be paid by cubic yard of material retained on the beach. The Contractor shall be responsible for the following: dredging within the designated area, transporting the dredged material to the beach at Wallops Island, discharging the material by hydraulic pump-off into placement site, grading the beach placement site to required elevations and dimensions, performing pre-placement and post-placement surveys of the dredged area and beach nourishment area, and communicating with maritime users to minimize impacts to vessel traffic, adjacent structures, and other dredging operations. In accordance with DFARS 236.204, the estimated construction price range for this project is between $10,000,000 and $25,000,000. NAICS Code 237990, Other Heavy and Civil Engineering Construction, applies to this project. The Government is not obligated to and will not pay for any information received from potential sources as a result of this synopsis. Construction Time: The work will commence first with performance beginning within 30 calendar days of receipt of Notice-to-Proceed (NTP). The construction

period of performance will be approximately 325 calendar days from issuance of the NTP. There are no seasonal restrictions on hopper dredging for this project. INDUSTRY SURVEY The following confidential survey questionnaire is designed to apprise the Corps of prospective contractors' project execution capabilities. Please provide your response to the following

questions. All

questions are in regard to NASA Wallops Beach Renourishment Project. Please provide company’s name, address,

point of contact, phone number, and e-mail address. Would you be interested in bidding on the solicitation when it is issued? If the answer is No, please explain why not? Have you worked on jobs similar in nature, complexity and magnitude to this project within the past 5 years? Have you managed the dredge material placement sites with the inflows similar in magnitude to this project in the past 5 years? If so, please describe the project(s) and for whom the work was performed. Indicate the dollar value of the project(s). Identify a

point of contact (s) and phone number, as a reference of relevant experience. Would you be bidding on this project as a sole contractor, prime contractor with subcontractor(s) or as a joint venture? Is there a dollar limit on the size of contract that you would bid? If so, what is that limit? What is the largest dredging contract, in dollars, on which you were the prime contractor? What is your bonding capacity per contract? What is your total bonding capacity? What is your firm’s business size (e.g., LB, SB, 8(a), HUBZone, SDVOSB, WOB)? Are you familiar with the safety and health

Get matched to contracts like this daily

Free AI-powered contract matching for your business.