ActiveOpen for Bids
Save

Design and Fabrication of Lightweight Multipurpose Shelter

Department of Defense (DoD)
FFP
est. $500K – $2.5M
Quick Brief

The Department of Defense is procuring Lightweight Multipurpose Shelters designed for transport on military vehicles, specifically the M1152A1 and M1152A1 with B2 Armor Kit. The contractor will be responsible for the design and fabrication of these shelters, which must be electromagnetic interference shielded and include necessary mounting kits and technical manuals. The contract spans five years and requires the contractor to provide all personnel, facilities, equipment, and materials for the project.

Generated 8d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

Deliverables

  • Lightweight Multi-Purpose Shelter Type I and Type III
  • Shelter to HMMWV Mounting Kit
  • Pintle Extension Kit
  • Technical Manual

Contract Details

Contract Typei
FFP
Estimated Value
est. $500K – $2.5M
Similar contracts award $17K to $148K (median $54K, 1,709 awards)Above typical range
Period of Performance
5 years
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published10d ago
Jul 15, 2026
Last Updated10d ago
Jul 15, 2026
Attachments Due10d ago
Jul 15, 2026
Controlled
Became Solicitation9d ago
Jul 15, 2026
Tracked
Response Dueyesterday
Jul 24, 2026

Description

The intent of this 5- year

Requirements contract is to provide for the design and fabrication of the Lightweight Multi-Purpose Shelter (LMS) Type I, Type III which are designed for transport on the M1152A1 and the M1152A1 with B2 Armor Kit High Mobility Multi- Purpose Wheeled Vehicle (HMMWV). These shelters are transported by rail, air, marine and highway when mounted or dismounted from their vehicles. These tactical rigid wall shelters are used to house battlefield electrical systems. The LMS Type I and Type III are Electromagnetic Interference (EMI) shielded. The contractor shall supply all necessary personnel, facilities, equipment and materials to accomplish the

requirements set forth herein. Each LMS, both First Article and Production, shall be equipped with one (1) Shelter to HMMWV Mounting Kit and one (1) Pintle Extension Kit which are separately boxed and stored inside the shelter. For production LMS, one (1) Technical Manual shall also be over-packed in each shelter with each end item delivered to the Government. Vehicle drawings and the vehicles themselves (M1152A1 Expanded Capacity Enhanced Integrated Armor Package (IAP)/Armor Ready HMMWV and M1152A1 with B2 Armor Kit Expanded Capacity Enhanced Armored HMMWV) will not be provided as Government Furnished Equipment (GFE) under this contract. It shall be the responsibility of the contractor to secure the use of sufficient vehicles and to mount the First Article Test Units on them prior to test and during validation of Technical Manual. Kelly Germano Alternative

Point of Contact Patrick Burch to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.