Closed
Save

Construction of B-21 Radio Frequency Hangar

Department of Defense (DoD) > US ARMY CORPS OF ENGINEERS
Firm-Fixed-Price
est. $5M – $50M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The U.S. Army Corps of Engineers is procuring the construction of a Radio Frequency/Measurements Hangar Facility at Whiteman Air Force Base, Missouri. The project includes a hangar with one aircraft position, associated back shops, material storage, and administrative spaces, totaling 5,345 square meters.

Generated 61d ago

Scope & Requirements

The contract involves the construction of a Radio Frequency/Measurements Hangar Facility, including a reinforced concrete foundation, metal roof, and supporting infrastructure.

Contract Details

Contract Type
Firm-Fixed-Price
Contract Vehicle
Design-Bid-Build
Estimated Value
est. $5M – $50M
Similar contracts award $25K$400K (median $99K, 73,582 awards)Above typical range
NAICS Codes
Place of Performance
Whiteman Air Force Base, Missouri, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF DEFENSE
Office
US ARMY CORPS OF ENGINEERS

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published2mo ago
Apr 2, 2026
Last Updated2mo ago
Apr 2, 2026
Became Solicitation2mo ago
Apr 2, 2026
Tracked
Response Due2mo ago
Apr 17, 2026

Description

The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends solicit, negotiate, and award a one-time Unrestricted, Firm-Fixed-Price, Design-Bid-Build, construction contract to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. at Whiteman Air Force Base (WAFB), MO.

Scope of Work: The scope of this contract is to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. The facility will consist of both unclassified and classified spaces for a total square footage of 5,345 square meter (57,532 square feet). Structure will feature a new reinforced concrete foundation by replacing the paved area east of the existing Phase Hangar (Building 9), a metal roof, metal siding panels on steel framing and girts above a masonry cavity wall and Concrete Masonry Unit wall assembly around the base of the facility, and powered steel sliding hangar doors. The project will also include supporting facilities such as utilities, pavements, site improvements, and other necessary infrastructure to have a complete and usable facility. David Miller Alternative

Point of Contact Michael France

Get matched to contracts like this daily

Free AI-powered contract matching for your business.