Initial Site Visit & RFI for Chilled Water System Repair

Department of Defense (DoD) > U.S. Air ForceSol: FA813726R0010
SBFFP
est. $50K – $200K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring construction services to repair the chilled water system at Building 2280, Tinker Air Force Base, Oklahoma. This project requires the contractor to provide all necessary materials, labor, and equipment, and to ensure compliance with specific training and safety protocols. Attendance at a mandatory site visit is required for contractors to be considered responsive.

Generated 16d ago

Scope & Requirements

The contractor will repair the chilled water system at Building 2280, requiring all materials, labor, and compliance with safety protocols.

Contract Details

Contract Typei
FFP
Estimated Value
est. $50K – $200K
Similar contracts award $25K$400K (median $99K, 73,582 awards)Within typical range
NAICS Codes
Place of Performance
Tinker Air Force Base, Oklahoma, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
small business

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
Air Force Materiel Command

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Site Visit RSVP Deadline2mo ago
Mar 30, 202623:59
Mandatory attendance
Published17d ago
May 18, 2026
Became Solicitation16d ago
May 18, 2026
Tracked
Last Updated15d ago
May 20, 2026
Response Date3d ago
Jun 1, 202623:59
Response Due2d ago
Jun 2, 2026

Description

This requirement is to be solicited as a total small business set-aside. The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma (project drawings can be provided to interested vendors for additional location and schematic information). Contact the primary or secondary

point of contact to request project drawings. This is a construction-only contract. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information is due by 11:59 PM CST, Monday, March 30th, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Contract documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.

Attachments include an EAL spreadsheet, please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The requirement will be awarded in accordance with Two-Step Sealed Bidding procedures (FAR 52.214-25) which calls for the initial submission of technical-only proposals before submission of price bids. As such, please plan on coordinating all necessary personnel and/or subcontractors whose assessment of the requirement will have an impact on the technical proposal and subsequent priced proposal. An additional site visit will not occur between receipt of the technical proposals and submission of price bids. The site visit is scheduled for April 10th, 2026 at 10:00 A.M. We will meet outside of the airfield walk gate just north of Bldg. 2280 at 10:00 A.M. More specific meeting details have been shared with vendors who have sent an RSVP. The due date for the RFIs arising from the initial site visit is April 21st, 2026 at 11:59 P.M. Please submit all RFIs to the primary and secondary points of contact. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees. All RFI responses have been received and compiled. Please see the

attachments for the RFI responses and their associated documents. Utilize these in continuing to formulate your Step One Technical Proposals. The formal RFP will be posted soon, and the due date associated with that will be the deadline to submit your technical proposals. The revised RFI responses are now attached. The responses provide additional clarification on some replies for utilization by offerors in formulating their Step One Technical Proposals. The revised responses are highlighted. Please reach out to the primary or secondary

point of contact should you have more

questions regarding the responses. Sharla Flowers Alternative

Get matched to contracts like this daily

Free AI-powered contract matching for your business.