The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.
The Department of Defense is seeking responses for the removal and replacement of two pedestrian walkway bridges at Joint Base San Antonio Lackland, TX. The project requires the installation of structurally sound prefabricated bridges compliant with ADA standards.
Get your fit score, win probability, and required capabilities.
The contractor shall remove and replace two pedestrian walkway bridges at Joint Base San Antonio Lackland, ensuring the new bridges are structurally sound and ADA-compliant.
This is a sources sought notice for the removal and replacement of two (2) pedestrian walkway bridges at Joint Base San Antonio (JBSA) Lackland, TX. The contractor shall provide all management, tools, equipment, and labor necessary to ensure that the removal and replacement of the existing Hole 18 Golf Cart Bridge (B490) and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex (CTA) are conducted in a manner that will provide a structurally sound prefabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA). The Government is conducting market research IAW Far Part 10. Please, review and fill out the attached Sources Sought form and return to the POCs listed in this notice if interested. Miranda Garza Alternative
Point of Contact Lauren Macias Contracting -671-3617 1655 SELFRIDGE AVE BLDG 5450 JBSA LACKLAND, TX 78236-5286 USA to this opportunity. Sources Sought Notice.docx
Get matched to contracts like this daily
Free AI-powered contract matching for your business.