ActiveSources Sought
Save

Repair and Replace Golf Course and Pedestrian Walkway Bridge

Department of Defense (DoD) > U.S. Air Force > AIR EDUCATION AND TRAINING COMMAND
est. $9M – $34M

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Quick Brief

The Department of Defense is seeking responses for the removal and replacement of two pedestrian walkway bridges at Joint Base San Antonio Lackland, TX. The project requires the installation of structurally sound prefabricated bridges compliant with ADA standards.

Generated 57d ago

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The contractor shall remove and replace two pedestrian walkway bridges at Joint Base San Antonio Lackland, ensuring the new bridges are structurally sound and ADA-compliant.

Deliverables

  • Removal of existing Hole 18 Golf Cart Bridge (B490)
  • Installation of new prefabricated Hole 18 Golf Cart Bridge (B490)
  • Removal of existing Pedestrian Bridge (B8160)
  • Installation of new prefabricated Pedestrian Bridge (B8160)

Contract Details

Estimated Value
est. $9M – $34M
Similar contracts award $9K$60K (median $22K, 17,163 awards)Above typical range
NAICS Codes
Place of Performance
Lackland, TX, USA

Qualifications & Eligibility

Set-Aside Category
8(a)

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE
Office
AIR EDUCATION AND TRAINING COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Response Date5mo ago
Jan 16, 202611:00 AM
CST
Became Special Notice4mo ago
Feb 6, 2026
Tracked
Response Duein 3y
Jan 9, 2029

Description

This is a sources sought notice for the removal and replacement of two (2) pedestrian walkway bridges at Joint Base San Antonio (JBSA) Lackland, TX. The contractor shall provide all management, tools, equipment, and labor necessary to ensure that the removal and replacement of the existing Hole 18 Golf Cart Bridge (B490) and the Pedestrian Bridge (B8160) at JBSA Chapman Training Annex (CTA) are conducted in a manner that will provide a structurally sound prefabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA). The Government is conducting market research IAW Far Part 10. Please, review and fill out the attached Sources Sought form and return to the POCs listed in this notice if interested. Miranda Garza Alternative

Point of Contact Lauren Macias Contracting -671-3617 1655 SELFRIDGE AVE BLDG 5450 JBSA LACKLAND, TX 78236-5286 USA to this opportunity. Sources Sought Notice.docx

Get matched to contracts like this daily

Free AI-powered contract matching for your business.