ActiveSources Sought
Save

Exterior Painting For Boise Medical Center Buildings 4, 120, and 124

Veterans Affairs (VA)Sol: 36C26026R0100
SDVOSB

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Value
Similar contracts award $9K to $71K (median $22K, 2,154 awards)
NAICS Codes
Set-Asides
SDVOSB

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published7d ago
Jul 17, 2026
Became Sources Sought6d ago
Jul 17, 2026
Tracked
Last Updated4d ago
Jul 19, 2026

Description

for project 531-26-3-5043-0091 Exterior Painting Boise VAMC BLDGS 4, 120, 124 is estimated to be posted to Federal Contracting Opportunities on or about July 24, 2026, with an estimated closing date on or about August 7, 2026. This will be 100% SDVOSB set-aside. The scope of this project includes all necessary labor, materials, equipment, supervision, and incidentals to prepare and paint designated exterior buildings elements at the Boise VA Medical Center, 500 West Fort Street, Boise, All work shall conform to the Statement of Work, manufacturer specifications, and applicable VA standards. General

Requirements Prepare, prime (as required), and apply finish coats to all specified surfaces per manufacturer instructions and VA/industry best practices. Match existing colors unless otherwise directed in writing Protect adjacent surfaces, landscaping, vehicles, pedestrians, and during painting operations. Repair, at no cost to the Government, any damage resulting from Contractor activities to equal or better than the original condition. Coordinate all work hours, site access, equipment staging, and safety/security measures with the COR and Facility Engineering Service prior to commencing work. Surface Preparation All Areas Clean all surfaces to remove dirt, mildew, loose coatings, rust, grease, and other contaminants using approved methods (hand tools, power washing, detergent, or solvent cleaning). Scrape and sand areas of loose or peeling paint; feather edges to sound substrate. Repair minor surface defects (cracks, holes) with compatible patching materials. Spot-prime bare, patched, or rusted areas with materials compatible with the finish system. Mask and protect all materials and areas not scheduled for painting. Buildings Building 4 Paint all exterior window frames, sashes, and trim. Paint all soffits and fascia. Paint rear walkway framing, beams, posts, soffits, and all metal/wood components including handrails and guardrails. Paint front patio cover and associated deck structure, including posts, beams, soffits, fascia, deck, guardrails, handrails, and undersides. Paint all previously painted exterior siding, doors, frames, and trim. Building 120 Paint previously coated soffits, fascia, doors, frames, and trim. Coat handrails, guardrails, posts, and brackets with specified metal coating system. Building 124 Paint all designated exterior stucco surfaces as directed by the COR. Clean and apply clear protective finish to existing clear-coated wood soffits. Paint previously coated soffits, fascia, doors, frames, and trim Charlene Johnson Ext 27037 to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.