Closed
Save

Replace Liner Inside Structural Fire Trainer

Department of Defense (DoD) > U.S. Air Force > AIR COMBAT COMMAND
est. $17K – $212K

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Defense is procuring a Fire Trainer Liner for the Air Combat Command, which involves replacing the liner inside a structural trainer. Key requirements include compliance with safety and thermal specifications, a unique installation method, and the ability to withstand high-pressure nozzle forces, among other specifications.

Generated 8d ago

Scope & Requirements

The work involves replacing the liner inside a structural trainer with materials that meet specific safety and performance standards.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Estimated Value
est. $17K – $212K
Similar contracts award $17K to $211K (median $60K, 5,900 awards)Within typical range
NAICS Codes

Qualifications & Eligibility

Set-Aside Category
ND

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
DEPT OF THE AIR FORCE
Office
AIR COMBAT COMMAND

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published10d ago
Jul 15, 2026
Last Updated10d ago
Jul 15, 2026
Became Solicitation9d ago
Jul 15, 2026
Tracked
Response Due5d ago
Jul 20, 2026
Response Datein 5d
Jul 30, 202614:00

Description

the structural trainer

REQUIREMENTS: The liner components units shall: 1. Designed to meet all referenced safety, thermal, and regulatory specifications, this specific material is engineered for extreme live-fire training evolutions. 2. Specifically formulated for Class A, B, C, D, Electrical, and F/K fires within a controlled burn cell which complies with NFPA 1402 and related standards. 3. Made of a cementitious high temp composite formula, which has a negative health impact when installed by certified installers. 4. Have Kevlar additives 5. Unique tongue and groove installation method 6. Stainless Steel mounting hardware 7. Have five (5) to ten (10) year warranty to replace 8. Able to withstand 150 psi nozzle forces 9. 1.5 inches thick requires no additional insulation behind its barrier 10. Heat transfer 10.4% (1000 degree / 140 degree in 10 minutes) 11. Complies with all NFPA suggested burn matrix formulas 12. Certified as a protective skin for flammable hazmat storage cells Michael

A. Berg Alternative

Point of Contact Ryan Rhea to this opportunity.

Get matched to contracts like this daily

Free AI-powered contract matching for your business.