The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring a prefabricated warehouse to be installed at Fort Buchanan, Puerto Rico. The contractor is required to provide all labor, materials, equipment, and transportation to design, manufacture, deliver, and install a modular in-plant system that accommodates specific layout and staging requirements.
The contractor will design, manufacture, deliver, and install a prefabricated modular in-plant warehouse system.
Prefabricated Warehouse . 613 The Contractor shall provide all labor, material, equipment, and transportation to design, manufacture, deliver, and install one (1) prefabricated modular in-plant . The system must accommodate an 8-station layout with projecting privacy panels, 8 pallet staging zones, and a 5.5-foot clear central aisle. Ricardo LOPEZ-HERNANDEZ
Get matched to contracts like this daily
Free AI-powered contract matching for your business.