The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring refurbishment and preventative maintenance services for an aircraft wash rack system at Dyess AFB, TX. Key requirements include a technical solution addressing the performance work statement and a schedule for the work to be performed over a 12-month period.
The work involves the repair and refurbishment of a custom-built aircraft wash rack foaming system along with 12 months of preventative maintenance.
The purpose of this amendment is to: Add the attachment “Site Visit #1
Questions and Anwers - Wash Rack Refurbishment” Clarify time to meet at Dyess Visitor Control Center Add verbiage outlining the time for the contract specialist departure from the VCC for contractor sign-on. A second site visit has been scheduled for
10 April 2026 at 10:00 am CDT. Any interested vendor should meet the contract specialist at Dyess AFB, TX Visitor Control Center at 09:00 am CDT. Interested vendors are to RSVP with [email protected]. The contract specialist shall depart from the VCC to the site visit location at 09:30AM. Amendment 1: A second site visit has been scheduled for
10 April 2026 at 10:00 am CST. Any interested vendor should meet at Dyess AFB, TX Visitor Control Center at 10 am CST. Interested vendors are to RSVP with [email protected]. This solicaition has posted calling for the repair and refurbishment of the currently installed custom built aircraft wash rack foaming system and 12 months of preventative maintenance. Please see RFQ FA466126Q0020 and it's attachment for all information and
requirements related to this solicitation. QUOTE SUBMISSION INFORMATION: E-mail is the required method for offer submission. The Contracting Specialist or Officer will send a confirmation email once your quote is received. If you do not receive a confirmation email, the Government did not receive your quote. Your offer shall include but is not limited to the following: 1. Complete (must be signed) Page 2 of RFQ (or contractor equivalent) 2. The contractor shall provide a technical solution/approach which address the minimum task outline within the Performance Work Statement (PWS). 3. A schedule/period of performance must be stated. 4. All Standard Commercial Warranties. The offeror is not required to use Page 2 of this RFQ; however, if you choose not to use it, all of the information on Page 2 must be included in your offer. Site Visit: A voluntary site visit for this requirement shall be held on
3 April 2026 at 10:00AM. Interested vendors are to RSVP with [email protected]. The contract specialist will meet all prospective offerors at the Dyess AFB, TX Visitor Control Center on
Get matched to contracts like this daily
Free AI-powered contract matching for your business.