The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring the DOOR, WTID, which requires specific manufacturing and quality standards. Key requirements include government source inspection and compliance with applicable marking and documentation standards.
The contractor must manufacture the DOOR, WTID according to specified design and quality requirements, ensuring compliance with government inspection standards.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov|4|N7M3.14|GB0|771-229-0478|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO|N/A|TO BE DETERMINED (TBD)|N00104|TBD|TBD|SEE SCHEDULE|TBD|||TBD|||||| NOTE FOR CONTRACTOR/ADMINISTRATIVE
CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2||| CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| All freight is FOB Origin. This solicitation is for a buy. The resultant award of this solicitation will be issued bilaterally, requiring contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government source inspection is required. o Unit Price: __________ FIRM o Extended Total Price: __________ FIRM o Quotation Valid for: ________ (Days) (Minimum 45 / Desired
60) o Procurement Turnaround Time in Days (PTAT): __________ o Awardee CAGE: __________ o Government Source Inspection CAGE, if not at source: __________ o DCMA DoDAAC ("S----A") for Gov't Source Inspection, if known: __________ o Final Acceptance / Packaging CAGE, if not at source: __________ o DCMA DoDAAC ("S----A") for Gov't Final Acceptance, if known: __________ Important Traceability Notice: If you are not the manufacturer of the material you are offering, you must provide a letter/official email from the OEM confirming your company is authorized as an authorized distributor of their items. \ 1. SCOPE 1.1 This contract/purchase order contains the
requirements for manufacture and the contract quality
requirements for the DOOR,WTID . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3.
REQUIREMENTS 3.1 Cage Code/Reference Number Items - The DOOR,WTID furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;70876 8100-1251-0191 LINE ITEM 113; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N,
Get matched to contracts like this daily
Free AI-powered contract matching for your business.