ActiveOpen for Bids
Save

Energy And Water Conservation Services For Fort Benning

Department of Defense (DoD) > U.S. Army > Alexandria Support Center HuntsvilleSol: W912DY26RA071
TBD
est. $15M – $60M
Quick Brief

The Department of the Army is procuring energy and water conservation services for Fort Benning, Georgia. The contractor will implement energy conservation measures to reduce utility consumption and maintenance, repair, and replacement costs. Requirements include enhancing system security and resilience through technologies such as distributed generation and energy storage.

Generated 23d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

Implementation of energy and water conservation measures to reduce utility costs and modernize infrastructure at Fort Benning.

Deliverables

  • Energy conservation measures (ECMs)
  • Distributed generation and energy storage technologies
  • Ongoing commissioning

Contract Details

Contract Type
TBD
Estimated Value
est. $15M – $60M
Similar contracts award $72K to $820K (median $257K, 101,934 awards)Above typical range
NAICS Codes
Place of Performance
Fort Benning, GA, USA

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
US Army Corps of Engineers
Office
Alexandria Support Center Huntsville

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published25d ago
Jun 29, 2026
Became Solicitation24d ago
Jun 29, 2026
Tracked
Last Updated22d ago
Jul 1, 2026
Response Duein 6d
Jul 29, 2026

Description

The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring

Contracting Officer (PCO). Kara Malto Alternative

Point of Contact James Ziegler

Get matched to contracts like this daily

Free AI-powered contract matching for your business.