The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.
Get your fit score, win probability, and required capabilities.
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg.
485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the
Contracting Officer’s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and
requirements. The Contractor shall refer to Section H for additional information regarding design
submittal
requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP. Nika Maldonado,
Get matched to contracts like this daily
Free AI-powered contract matching for your business.