ActiveSources Sought
Save

Bowling Center Renovation and Food and Beverage Upgrades

Department of Defense (DoD)Sol: NAVMWR-26-R-0038

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Value
Similar contracts award $25K$400K (median $99K, 73,582 awards)
NAICS Codes

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published20d ago
May 15, 2026
Became Solicitation19d ago
May 15, 2026
Tracked
Became Presolicitation19d ago
May 15, 2026
Tracked
Became Sources Sought19d ago
May 16, 2026
Tracked
Last Updated18d ago
May 17, 2026
Response Duein 6d
Jun 9, 2026

Description

The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg.

485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility. The Work includes, but not limited to: 1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the

Contracting Officer’s Representative (COR). 2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and

requirements. The Contractor shall refer to Section H for additional information regarding design

submittal

requirements. 3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work. Additional information provided in attached RFP. Nika Maldonado,

Get matched to contracts like this daily

Free AI-powered contract matching for your business.