ActiveMonitor
Save

Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar

Department of Defense (DoD) > Navfac Atlantic Cmdnavfac Mid-AtlanticSol: N4008526B0008
HUBZoneSDBSDVOSBWOSBFFP
$44K – $1.1M per task order

Informational notice — track for solicitation

This opportunity is not yet open for proposals. Use this time to prepare — engaging early (capability statement, contacting the agency) can position you for the upcoming solicitation.

Quick Brief

The Department of Defense is procuring dredging services at the JEB Little Creek Fuel Pier and Anzio Beach Sandbar, as well as the JEB Fort Story Utah Beach Sandbar in Virginia Beach, Virginia. The project involves the removal of dredged material, debris, and vegetation, followed by the creation of berm areas and other related construction activities, all to be completed within 471 calendar days after award. The estimated construction value is between $10,000,000 and $25,000,000, and the procurement is open for full competition.

Generated 13d ago

Want to track notices like this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The work involves dredging at specified locations, including the unloading and placement of dredged material, debris removal, and the creation of berms.

Contract Details

Contract Typei
FFP
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $37M
Similar contracts award $44K to $1.1M (median $204K, 8,308 awards)
Period of Performance
471 calendar days after award
NAICS Codes
Place of Performance
Virginia Beach, Virginia, USA
Set-Asides
HUBZone, SDB, SDVOSB, WOSB

Qualifications & Eligibility

NAICS Size Standard
$37,000,000
Past Performance
relevant experience in performing efforts of similar size, scope, and complexity within the last five (5) years

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
NAVFAC ATLANTIC CMDNAVFAC MID-ATLANTIC

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published16d ago
Jul 8, 2026
Became Presolicitation15d ago
Jul 8, 2026
Tracked
Last Updated13d ago
Jul 10, 2026

Description

This Design-Bid-Build project includes dredging of the JEB Little Creek Fuel Pier, JEB Little Creek Anzio Beach Sandbar, and JEB Fort Story Utah Beach Sandbar. Material shall be dredged using a standard clamshell bucket, placed into scow/barge and transported to and deposit near shore area. Incidental related work as follows: 1. Hydraulically unload from barge/scow (or direct pump) to place dredged material from JEBLC Anzio Beach Sand Bar to create Berm Areas #3, #4, #5, #6 and #7 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications. 2. Hydraulically unload from barge/ scow (or direct pump) to place dredged material from JEB Fort Story Utah Beach Sand Bar to create Berm Areas #8 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications. 3. Hydraulically unload from barge/scow (or direct pump) to place dredged material from JEB Fort Story Utah Beach Sand Bar to create Berm Areas #9 and #10 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications. The completion time for this contract is 471 calendar days after award. The source selection procurement method to be utilized is FAR Part 14, Sealed Bidding. The appropriate Northern American Industry System (NAICS) code for this procurement is 237990, Dredging and Surface Cleanup Activities2, and the Small Business Size Standard is $37,000,000. The magnitude of construction for this project is between $10,000,000 to $25,000,000. This . A Small Business Search (SBS) and a Sources Sought Notice was conducted and issued on

15 April 2026, seeking eligible Small Businesses, HUBZone Small Business, Small Disadvantaged Businesses, Service-Disabled Veteran-Owned Small Businesses, and Women-Owned Small Businesses to determine the opportunity for a set-aside. The Government invited prospective offerors with the capabilities of performing construction services that meet or exceed the stated requirement to submit a capabilities statement. Respondents were required to submit relevant experience in performing efforts of similar size, scope, and complexity within the last five (5) years. Based on the market research conducted for this procurement and in accordance with FAR 19.104-1(a) (DEVIATION 2026-O0037), the

Contracting Officer has determined that there is not a reasonable expectation that an adequate number of Small Business firms would respond to or be qualified to perform the

requirements of this solicitation. Successful award and completion of the

requirements can be achieved by soliciting the contract as "Unrestricted" for full and open competition. A DD2579 Small Business Coordination Record was approved by the NAVFAC MIDLANT Small Business Professional on

23 June 2026. On

Get matched to contracts like this daily

Free AI-powered contract matching for your business.