The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of Defense is procuring construction services for the Mid-Bay James Island Phase 1 Ecosystem Restoration project, which includes the construction of dikes and the dredging and stockpiling of sand materials in Dorchester County, Maryland. The project aims to restore the ecosystem by creating a perimeter dike structure and excavating substantial sand materials for future construction, with a contract value estimated between $100,000,000 and $250,000,000 and a duration of approximately 540 calendar days.
The work involves constructing dikes and dredging sand materials for the ecosystem restoration project.
23 February 2026 The USACE Baltimore District intends to solicit for an award a James Island is an ecosystem restoration project (part of the Mid-Chesapeake Bay Island Ecosystem Restoration project, commonly referred to as Mid-Bay) located in the middle Chesapeake Bay in Dorchester County, Maryland, approximately 72 miles south-southeast of the Port of Baltimore and two miles west of Hoopers Island. This contract will include the construction of multiple features at James Island that facilitate the restoration efforts: (1) Construction of dikes; and (2) dredging and stockpiling of sand materials. Dikes (approximately 10,000 linear feet): this feature will include the installation of stone, geotextile and sand materials to create a perimeter dike structure. Stone and geotextile materials will be shipped to the site and installed. Sand materials will be dredged from a local borrow area. Sand Stockpiling (approximately 3,000,000 cubic yards): this feature will include the excavation of substantial sand materials from a local borrow area with placement occurring within the newly constructed dikes (containment area) for future dike construction. The borrow area for sand material excavation (dredging) is located immediately adjacent to the construction area. All work will be performed adjacent to James Island in the Chesapeake Bay, a remote location accessible only by boat. The Contractor shall provide all necessary labor, equipment, materials, and transportation to perform the construction. The magnitude of construction is between $100,000,000 and $250,000,000.00. The construction duration is approximately 1095 calendar days from the Notice to Proceed. Amendment 0001, dated
21 November 2025, the purpose of this amendment is to provide the correct
period of performance to 540 calendar days, update clauses 52.211-12, 52.211-10 and 52.217-7, update provision 52.204-8, remove clause 52.226-1 and to include clauses 52.219-16, 52.242-5, 252.219-7000 and 252.219-7003. All other terms and conditions of the solicitation remain unchanged.Amendment 0003 dated
18 December 2025, The purpose of this amendment is to provide clarifications from the RFI responses; 1. The Government will not be extending the RFI period for this solicitation. No further RFIs will be accepted. 2. Draft conditions for the permits were provided in Amendment 0002. The Government does not expect any substantive change in conditions between the draft language provided and the final permits. The Government will provide final permits to all bidders upon receipt, 3. CLIN 0003AK Type A Geotextile quantity changed to 10,026 SY. All other terms and conditions of this solicitation remain unchanged.Amendment 0004, dated
22 December 2025, The purpose of this amendment is to change the bid opening date from