The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Monongahela National Forest is procuring construction services for the FR76 Embankment Stabilization Project, which includes constructing retaining walls, removing and resetting drainage culverts and guardrails, and regrading portions of Forest Road 76. This project is set aside for small business concerns with a size standard of $45 million.
The project involves construction services for embankment stabilization, including the installation of retaining walls and drainage systems.
The Monongahela National Forest requests construction services to construct three (3) solider pile and concrete lagging retaining walls, remove existing drainage culverts, remove and reset existing guardrail, install new drainage culverts, dewater stream, place riprap along streambanks as well as in-stream, regrade stream channel, re-construct and re-grade portions of Forest Road 76 (FR-76), and install rebar and non-shrink, high strength grout along existing bridge abutment foundations as shown in the drawings. Solicitation number 12445526B0007 is issued as an Invitation for Bid (IFB) for Forest Road 76 Embankment Stabilization. This acquisition is set-aside for small business concerns. The applicable North American Industry Standard Code is 237310 The small business size standard is 45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a bid which will be considered by the agency. The official source of information for this solicitation is the System for Award Management (located at sam.gov). If you are reading this IFB anywhere other than SAM, refer to the solicitation notice on sam.gov to ensure you have the most up-to-date information. The public opening of bids will be held virtually, via Microsoft Teams. Attendence information will be posted at a later date. BOUCHER, PAUL A Contracting (No Street Address
2) Atlanta, GA 303092449 USA to this opportunity. Amd_0001_12445526B0007.pdf Sol_12445526B0007.pdf Att 01_SCHEDULE OF ITEMS FR 76 EMBANKMENT REPAIR PROJECT (ERFO).xlsx Att 02_SOW - FR 76 Embankment Stabilization.docx Att 03_FP-14 Standard Specifications.pdf Att 04_Embankment Stabilization Project_Drawings.pdf Att 05_Wage Rates.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.