The Department of Energy is procuring construction services for the Poncha Substation to increase reliability and provide backup power. The project involves demolition, site development, and the installation of main station service equipment including transformers, generators, and switchboards.
Get your fit score, win probability, and required capabilities.
Multi-part project to upgrade the Poncha substation service feed and backup power systems, including demolition and installation of electrical infrastructure.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gova multi-part project to increase the reliability of the Poncha substation service feed and provide backup power to help decrease station service outages. The principal components of work include the following:a. Provide demolition and site development.b. Furnish and install main station service equipment consisting of pad mount transformer, safety switches, automatic transfer switch, backup generator, and main AC switchboard.c. Furnish and install over the trench distribution panels inside control building.d. Furnish and install gas cart safety switches.e. Furnish and install LP tank and generator pad.f. Remove and dispose of two (2) existing pad mount transformers designated K1 and K2 with associated equipment.g. Furnish and install grounding systems, conduit, and insulated cable.h. Install associated cable terminations. Pratt, John W. Contracting . CROSSROADS BLVD (No Street Address
2) LOVELAND, CO 80538 USA
Get matched to contracts like this daily
Free AI-powered contract matching for your business.