ActiveOpen for Bids
Save

Noaa/Uscg Recapitalization Project (Design-Build)

Dept. of Commerce
TBD
$44K – $1.1M per task order
Quick Brief

The Department of Commerce, through the National Oceanic and Atmospheric Administration (NOAA), is hosting an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event aims to provide an overview of the project scope, highlight technical challenges, and facilitate market awareness ahead of the formal solicitation. The project involves the Design-Build recapitalization of waterfront infrastructure to support Coast Guard operations, with an anticipated construction magnitude of approximately $125M to $200M.

Generated 13d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project involves the Design-Build recapitalization of waterfront infrastructure to support the homeporting of USCGC STORIS and visiting cutter classes.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Type
TBD
Contract Value
$44K – $1.1M per task order
IDIQ ceiling: $200M
Similar contracts award $44K$1.1M (median $203K, 8,719 awards)
NAICS Codes
Place of Performance
Juneau, Alaska, USA

Agency & Contact

Contracting Organization

Agency
COMMERCE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published14d ago
May 21, 2026
Last Updated14d ago
May 21, 2026
Became Special Notice14d ago
May 21, 2026
Tracked
Became Solicitation14d ago
May 21, 2026
Tracked
RSVP Deadline8d ago
May 27, 2026
Industry Day Dateyesterday
Jun 3, 202616:00
Response Duein 18d
Jun 22, 2026

Description

The National Oceanic and Atmospheric Administration (NOAA), in support of the United States Coast Guard (USCG), invites interested industry partners to attend an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event is intended to: Provide a high-level overview of the project scope and

objectives Highlight key technical challenges and execution considerations Offer industry insight into site conditions and operational constraints Support market awareness in advance of the formal solicitation Provide a site walk for potential design/build contractors Project Overview: The Government is planning a Design-Build (DB) project to recapitalize and modernize the waterfront infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. The project will deliver a resilient, mission-ready waterfront facility capable of supporting Coast Guard operations in the Arctic and Alaska region, including search and rescue, maritime security, environmental response, and national defense missions. The anticipated construction magnitude is approximately $125M–$200M, with contract award currently projected for FY26 (Q4). Scope Overview (High-Level): The project generally includes the Design-Build recapitalization of the existing waterfront and supporting infrastructure, including: Demolition of aging waterfront wharf and support facilities (not existing shoreside buildings) Construction of a new wharf to support at least (1) cutter berth Construction of a new floating pier system supporting multiple (2) cutter berths Fender systems and mooring infrastructure for USCG and visiting vessels Shore power and electrical system upgrades Potable water, sewer, fire protection, and communications systems Backup power and site-wide utility distribution Civil/site improvements Optional work may include the following: MWD building renovations Covered floating small boat facility Additional building renovations Dredging Note: This overview is provided for general awareness only. Detailed

requirements will be included in the forthcoming Request for Proposals (RFP). Key Technical Considerations: This project presents significant technical and logistical challenges, including: Extreme tidal variation (>25 feet) 100 MPH localized Taku wind events High seismic design

requirements Cold-region construction and corrosion exposure Heavy cutter berthing and mooring loads The project site is an active, 24/7 operational Coast Guard installation and there will be a requirement to maintain continuous USCG operations during construction Temporary utilities, access, and mooring systems will be required Marine logistics, seasonal work windows, and environmental permitting will be critical Cold-region or Arctic construction Site Walk: A site walk of USCG Station Juneau waterfront facilities will be conducted as part of Industry Day. The site walk will include the following: Provide firsthand understanding of existing conditions Support industry planning for constructability and execution RSVP: The Industry Date is set to occur on Wednesday, June 3, 2026. All interested parties shall complete the Google Form as provided in the link below by May 27, 2026. An email with event details will be provided separately. Please direct all

questions regarding Industry Day to [email protected] and [email protected]. This link works (please copy and past if the link below blocks you or asks for permission): https://docs.google.com/forms/d/e/1FAIpQLSe2dDAvgZxpy95dG2BkEgwk-uiyceDvxuna-5E2CNc1gnq3cg/viewform Disclaimer: This Industry Day is for informational purposes only and does not constitute a solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice. Jana Kolb Alternative

Point of Contact AMY L. MCLIVERTY

Get matched to contracts like this daily

Free AI-powered contract matching for your business.