ActiveOpen for Bids
Save

Pneumatic Tubes, Except Aircraft

Department of Defense (DoD)
FFP
Quick Brief

The Department of Defense is procuring pneumatic tubes for machinery manufacturing, specifically the TIRE300-15,22PR,FL- model. The procurement requires that the tires meet specific material and physical requirements, including shelf-life considerations, and mandates government source inspection. Delivery is expected within 90 days.

Generated 9d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The contract involves the manufacture of pneumatic tubes, specifically the TIRE300-15,22PR,FL- model, requiring compliance with military standards and shelf-life management.

Attachments

No files on SAM.gov

This listing does not include downloadable attachments. The solicitation details may be in the description below.

Verify on SAM.gov

Contract Details

Contract Typei
FFP
Estimated Value
Not specified
Similar contracts award $478 to $16K (median $3K, 18,893 awards)
NAICS Codes
Place of Performance
Mechanicsburg, PA, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published10d ago
Jul 15, 2026
Last Updated10d ago
Jul 15, 2026
Became Solicitation9d ago
Jul 15, 2026
Tracked
Response Duein 20d
Aug 14, 2026

Description

|4|N97113|FE|771-229-0460|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| GENERAL INFORMATION-FOB-DESTINATION|1|B| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)|Inspection / Acceptance Point: Source|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|N/A|N/A|N/A|N/A|[email protected]| NOTE FOR CONTRACTOR/ADMINISTRATIVE

CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND2025-O0004))|13|333998|700|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| PLEASE NOTE THE NEW PART NUMBER. CONTINENTAL PNEUMATIC INDUSTRIAL TIRES P/N: 07022640000 (TIRE 300-15, 22PR,FL-08) MFG. CONTINENTAL AG CAGE CODE (D0198); SHELF-LIFE REQUIREMENT These tires are no longer manufactured. Trying to procure available tires in market. \ NOTE: THIS IS SHELF LIFE ITEM Y UU). PLEASE ENSURE YOUR YOUR MATERIAL CAN MEET THIS REQUIREMENT. GOVERNMENT SOURCE INSPECTION per FAR 52.246-2 IS REQUIRED. DELIVERY 90 DAYS. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either depositedin the mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein. \ 1. SCOPE 1.1 This contract/purchase order contains the

requirements for manufacture of the TIRE300-15,22PR,FL- . 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3.

REQUIREMENTS 3.1 Manufacturing and Design - The TIRE300-15,22PR,FL- furnished under this contract/purchase order shall meet the material and physical

requirements as specified ; CONTINENTAL PNEUMATIC INDUSTRIAL TIRES P/N: 07022640000 (TIRE 300-15, 22PR, FL-08) MFG. CONTINENTAL AG CAGE CODE (D0198); SHELF-LIFE REQUIREMENT ; . 3.2 Marking - Unless marking

requirements are specified by a document or drawing cited in this solicitation all items delivered under this contract/purchase order shall be marked and identified in accordance with the applicable Military Standards and Specifications as follows: Mechanical Parts, Assemblies and Equipments - MIL-STD-130 Electrical and Electronic Parts - MIL-STD-1285, Method 1. Electrical and Electronic Parts and Assemblies not covered by MIL-STD-1285-use MIL-STD-130. Electronic Equipment - MIL-STD-454 Requirement Number 67. Electrical Equipment - MIL-P-15024/5 (SHIPS) 3.3 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973, Paragraph 5.4.8.2 and Appendix

Get matched to contracts like this daily

Free AI-powered contract matching for your business.