The response deadline has passed. Review the details for future reference or to track similar opportunities.
The Department of the Navy, through NAVSUP Weapon Systems Support, is procuring repair services for Local Control Units under a firm-fixed-price contract, requiring adherence to Defense Priorities and Allocations System regulations, Government Source Inspection, and accurate tracking via the Commercial Asset Visibility system with a mandatory 179-day turnaround time from physical receipt of the asset.
Repair of Local Control Units with strict turnaround time requirements, Government Source Inspection, and mandatory tracking through the Commercial Asset Visibility system; contract includes an option for increased quantity at the same unit price.
This listing does not include downloadable attachments. The solicitation details may be in the description below.
Verify on SAM.gov(JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORTS (COMBO)|N/A|TBD|N00104|TBD|TBD|SEE SCHEDULE|TBD|N/A|N/A|TBD|||||| CONTRACT DEFINITIZATION (MAY 2023)|5|FIRM-FIXED|FIXED-PRICE|X|FIRM-FIXED PRICE|TBD, per award remarks; follow-on modification will be issued by the PCO to firm unit
pricing and definitize the contract.| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025))|1|| OPTION FOR INCREASED QUANTITY (MAR 1989)|1|179 DAYS| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20||||||||||||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| THE CLOSING DATE IS HEREBY UPDATED TO
30 APRIL 2026 This is a rated order certified for national defense use, and the Contract will follow all the
requirements of the Defense Priorities and Allocations System regulation (15 CFR 700). Accelerated delivery is encouraged and accepted before the delivery date(s) listed in the schedule. ^^ All freight is FOB Origin. The resultant award of this REPAIR solicitation will be issued bilaterally, requiring the contractor's written acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding. Government Source Inspection (GSI) is required. Your quote should include the following information: QUOTE AMOUNT AND RTAT Unit Price:__________ Total Price:__________ Repair Turnaround Time (RTAT): _______ days Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. Return Material Authorization # (RMA), if applicable:__________ AWARDEE INFO & PERFORMANCE LOCATION Awardee CAGE: __________ Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________ Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________ The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The
Contracting Officer may exercise the option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree. \ 1. SCOPE 1.1 This contract/purchase order contains the
Get matched to contracts like this daily
Free AI-powered contract matching for your business.