ActiveOpen for Bids
Save

Architectural Engineering Services for New Medical Center in San Antonio

Department of Defense (DoD)Sol: W9126G26RA040
HUBZoneSDBSDVOSBWOSBTBD
$72K – $820K per task order
Quick Brief

The Department of Defense is procuring architectural engineering services for the Veterans Affairs New Medical Center in San Antonio. The procurement requires the submission of a minimum of five projects demonstrating relevant experience, with specific details on design completion and project scope. Each project must be clearly defined, including the extent of work performed and completion dates, and must be ready for construction.

Generated 12d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Contract Type
TBD
Contract Vehiclei
IDIQ
Contract Value
$72K – $820K per task order
IDIQ ceiling: $90M
Similar contracts award $72K to $820K (median $257K, 101,934 awards)
NAICS Codes
Place of Performance
San Antonio
Set-Asides
HUBZone, SDB, SDVOSB, WOSB

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published14d ago
Jul 10, 2026
Became Solicitation13d ago
Jul 10, 2026
Tracked
Last Updated11d ago
Jul 12, 2026
Response Duein 19d
Aug 11, 2026

Description

A minimum of five projects for the proposed team (including joint ventures and teaming partners) may be shown in Part I, Section

F. Each project is limited to two pages. Additional projects may be submitted provided the overall page limit for the SF 330 is not exceeded. A “project” is defined as work performed at one site or a single installation/campus. An Indefinite Delivery Contract (IDC) will not be considered a “project” for the purposes of evaluation, unless it is for phased work performed at one site or a single installation/campus. Individual Task Order contracts awarded from an IDC contract will only be considered as a single project, regardless of the number of facilities and/or the range of the

scope of work (i.e. a single Task Order contract cannot be submitted as multiple projects for the submission

requirements in this synopsis.) If the offeror provides a specific task order a project, it should provide the base contract number and the task order number for reference purposes. Project descriptions shall clearly state extent of work performed by the team, extent of design completed (for instance, preparation of design-build package; 100% design; etc.), dates of completion for design and construction, project category type (new/renovation), design fee, and estimated or actual construction costs. Clearly cite whether the experience is that of the prime (or joint venture), Designer of Record (DOR) for Design-Build (DB), consultant or an individual for each project in Part I, Section

F. Work cited that is experience of the prime (or joint venture) from an , Section C should be so labeled. A project will be evaluated in its entirety if the final design package was completed on or after June 2014. Project (or phases of projects) for which design is not complete will not be considered. A “completed” design is defined as ready for construction (Ready to Advertise (RTA) for Design-Bid-Build (DBB) or released for construction for Design-Build (DB), Integrated Design and Construction (IDAC) or similar construction method).

Get matched to contracts like this daily

Free AI-powered contract matching for your business.