The Department of the Navy is procuring renovation services for Room 136 in Building 68 at the Naval Undersea Warfare Center Division Newport. The project involves interior renovations, including duct work and wall sealing, while excluding roof repairs and new glazing. Contractors must maintain an active registration in SAM.gov to access controlled solicitation documents.

Generated 28d ago

Scope & Requirements

Renovation of Room 136 in Building 68, including flex duct penetration sealing and general interior improvements.

Contract Details

Contract Typei
FFP
Estimated Value
est. $15K – $65K
Similar contracts award $25K to $402K (median $99K, 70,896 awards)Within typical range
NAICS Codes
Place of Performance
Newport, RI, USA
Set-Asides
SB

Qualifications & Eligibility

Set-Aside Category
Small Business
Required Registrations
  • SAM.gov

Agency & Contact

Contracting Organization

Agency
DEPT OF DEFENSE
Sub-Agency
NAVSEA WARFARE CENTER

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Amendment 00012mo ago
Jun 2, 2026
Revised Attachment #3 and answered RFI 001
Published29d ago
Jun 26, 2026
Became Solicitation28d ago
Jun 26, 2026
Tracked
Last Updated26d ago
Jun 28, 2026
Response Due16d ago
Jul 8, 2026

Description

The purpose of this Amendment is to: Replace Attachment #3 with revised version dated

18 May 2026. Answer RFI 001 as seen below. RFI 001 1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable? A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed. 2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured. A2. No new glazing is required. 3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active. A3. Leak is no longer active. No repairs to roof are required. 4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the

scope of work for only the Rm 136 renovations? A4. See Revised Specifications (REV 1). 5. There is no spec for the glass for the windows. Will a spec section for the glass be made available? A5. See Revised Specifications (REV 1). 6. Does the electrical subcontractor performing the electrical

scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project? A6. Out-of-State is Allowed. 7. Are electric man-lifts permitted for use on this project? A7. Yes, however, it might be difficult getting a man lift in the area of work. All other solicitation terms and conditions remain unchanged. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Please see N6660426Q0291 and all

attachments for complete requirement details. Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV. Interested parties should request access to drawings, specifications, and photos within the

attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV. A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter. You must request access to the attachment by clicking on its title and providing the reason you need access. You will not receive immediate access to view the document. The

Get matched to contracts like this daily

Free AI-powered contract matching for your business.