Oil Transformer and Switch Enclosure Upgrades

Veterans Affairs (VA) > NETWORK CONTRACT (36C252)
FFP
est. $450K – $1.2M
Quick Brief

The Department of Veterans Affairs is procuring upgrades to oil transformers and switch enclosures at the Captain James A. Lovell FHCC in North Chicago, IL. The project involves replacing medium voltage oil-filled transformers and electrical distribution switchboards, along with necessary site preparations and installations to ensure compliance and safety. The contractor must expedite planning and execution to avoid delays caused by long lead times and ensure a robust quality assurance and safety plan.

Generated 2d ago

Can you win this contract?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Contract Details

Contract Typei
FFP
Estimated Value
est. $450K – $1.2M
Similar contracts award $13K to $139K (median $39K, 9,258 awards)Above typical range
Period of Performance
357 days
NAICS Codes
Place of Performance
North Chicago, IL, USA

Agency & Contact

Contracting Organization

Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-Agency
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT (36C252)

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Pre-Longest Lead Item Construction1814y ago
Jan 1, 214
GC to determine
Longest Lead Item Delivery Date1813y ago
Jan 1, 215
GC to determine
Post Long-Lead Item Construction1693y ago
Jan 1, 335
GC to determine
Construction Complete and Closeouts approved1672y ago
Jan 1, 356
Closeout (Contract end date)1671y ago
Jan 1, 357
Division 02+ Submissions77y ago
Jan 1, 1950
Division 02+ VA Reviews56y ago
Jan 1, 1971
Longest Lead Item Procurement55y ago
Jan 1, 1972
GC to determine and submit
VA review and GC revise schedule34y ago
Jan 1, 1993
Mobilize and Demo33y ago
Jan 1, 1994
If all pre-construction submittals were approved
Notice To Proceed27y ago
Jan 1, 2000
Published4d ago
Jul 20, 2026
Last Updated4d ago
Jul 20, 2026
Became Solicitation3d ago
Jul 20, 2026
Tracked
Response Duein 18d
Aug 11, 2026
Division 01 VA Reviewsin 8y
Jan 1, 2035
Division 01 Submissions Completed
Day 14

Description

Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James

A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project

Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James

A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2:

Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project

Requirements: Project