The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.
The Department of Transportation is procuring construction services for the rehabilitation of the Madison Wetland Management District Headquarters road. The project involves pavement reconstruction for the approach road and parking lot, aiming to enhance safety and mobility for staff and visitors, while extending the service life of the access road and parking lot. Key requirements include the installation of asphalt concrete pavement, aggregate base material, and updated pavement markings for parking stalls.
Get your fit score, win probability, and required capabilities.
The project includes pavement reconstruction for the approach road and parking lot at the Madison Wetland Management District Headquarters, improving access and safety for visitors.
The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces. SCOPE OF THE WORK: The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74. The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break. Douglas Whitcomb Alternative
Point of Contact Jorey Deml Contracting . DAKOTA AVE (No Street Address
2) LAKEWOOD, CO 80228 USA to this opportunity. 6982AF25B000008 - SD FTFW MADI 10(2) and 9000(1).pdf SD FW MADI 10(2) and 9000(1) PLANS_SEALED.pdf SD FW MADI 10(2) and 9000(1) PVMT Report.pdf FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.