ActiveSources Sought
Save

Rehabilitation of Madison WMD Headquarters Road

Dept. of Transportation > Federal Highway AdministrationSol: 6982AF26B000008
FFP
est. $32K – $465K

This is a Sources Sought notice

The agency is researching potential vendors before issuing a formal solicitation. Responding shows your capabilities and can influence the final RFP.

Quick Brief

The Department of Transportation is procuring construction services for the rehabilitation of the Madison Wetland Management District Headquarters road. The project involves pavement reconstruction for the approach road and parking lot, aiming to enhance safety and mobility for staff and visitors, while extending the service life of the access road and parking lot. Key requirements include the installation of asphalt concrete pavement, aggregate base material, and updated pavement markings for parking stalls.

Generated 19d ago

Can you respond to this?

Get your fit score, win probability, and required capabilities.

Fit Score7/10Consider

Scope & Requirements

The project includes pavement reconstruction for the approach road and parking lot at the Madison Wetland Management District Headquarters, improving access and safety for visitors.

Contract Details

Contract Typei
FFP
Estimated Value
est. $32K – $465K
Similar contracts award $32K$465K (median $129K, 8,020 awards)Within typical range
NAICS Codes
Place of Performance
Lakewood, CO, USA

Agency & Contact

Contracting Organization

Agency
TRANSPORTATION, DEPARTMENT OF
Sub-Agency
Federal Highway Administration

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published20d ago
May 15, 2026
Became Solicitation19d ago
May 15, 2026
Tracked
Became Sources Sought19d ago
May 16, 2026
Tracked
Last Updated18d ago
May 17, 2026
Response Duein 11d
Jun 14, 2026

Description

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces. SCOPE OF THE WORK: The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74. The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break. Douglas Whitcomb Alternative

Point of Contact Jorey Deml Contracting . DAKOTA AVE (No Street Address

2) LAKEWOOD, CO 80228 USA to this opportunity. 6982AF25B000008 - SD FTFW MADI 10(2) and 9000(1).pdf SD FW MADI 10(2) and 9000(1) PLANS_SEALED.pdf SD FW MADI 10(2) and 9000(1) PVMT Report.pdf FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf

Get matched to contracts like this daily

Free AI-powered contract matching for your business.