The Department of Veterans Affairs is procuring services to replace underground and aboveground storage tanks and their associated leak detection systems on the Fargo VA campus. Key requirements include environmental assessments, compliance with security standards, and a phasing plan to maintain backup generator operations.
The contractor will replace existing underground and aboveground storage tanks, including associated piping and leak detection systems, while ensuring compliance with environmental and security standards.
36C26326B0016_0001 AND 36C26326B0016_0002 ARE ACTIVE. AMENDMENT 0001 IS TO PROVIDE KTR ANSWERS TO
QUESTIONS, SIGN IN SHEET, AND PROVIDE SITE AGENDA. 36C26326B0016_0002 IS TO EXTEND BID DUE DATE TO APRIL 14, 2026 AT 2PM. Within SAM.gov, you need to search the entire 36C26326B0016_0001 (with the underscore _0001 or _0002). We are currently trying to connect the actions. PLEASE SEND ALL BIDS TO [email protected]. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/27174868743550?p=bP57p3XXoNidCOVBB2 Meeting ID: 271 748 687 435 50 Passcode: d9WH3bK9 Need help? | System reference Dial in by phone +1 205-235-3524, 611062594# United States, Dora Find a local number Phone conference ID: 611 062 594# For organizers: Meeting options | Reset dial-in PIN The Contractor shall furnish all labor, materials, and equipment to replace existing UST’s (Underground Storage Tank) #1, #2, #3, #4, #8, existing AST’s (Aboveground Storage Tank) #4, and #5, along with existing #1, #2, #3, #4, #8, #9 and #10 UST interconnected below-grade piping systems on the Fargo VA campus including designing flexible spill containment liners, tertiary containment barriers, encasement barriers, waterproof manway covers, and Auto Tank Gauges (ATG) with integrated monitoring and reporting. Environmental assessments, soil boring tests and geotechnical drilling at four VA site locations required, along with compliance with physical security and resiliency standards for intrusion and blast protection. A phasing plan to ensure zero downtime for existing backup generators with temporary power solutions shall be proposed & followed. Additional work includes cathodic protection system design, semiautomatic pump clarification systems, and establish control points for future construction POP: 540 days. Benjamin Woehrle to this opportunity. Replace UST Leak Solicitation Final 36C26326B0016.pdf
Get matched to contracts like this daily
Free AI-powered contract matching for your business.