Closed
Save

Smoky Circle Fire Center HVAC System Replacement

USDA
est. $5.0M – $45M

This opportunity is closed

The response deadline has passed. Review the details for future reference or to track similar opportunities.

Quick Brief

The Department of Agriculture is procuring HVAC replacement services for the Smoky Circle Fire Center. The contractor will be responsible for removing, disposing, and replacing existing HVAC units and associated ducting work, ensuring compliance with all regulations and obtaining necessary permits.

Generated 61d ago

Scope & Requirements

The contractor will remove and replace existing HVAC units and perform associated ducting work, ensuring compliance with specifications and regulations.

Contract Details

Estimated Value
est. $5.0M – $45M
Similar contracts award $13K$126K (median $35K, 14,862 awards)Above typical range
NAICS Codes
Place of Performance
Albuquerque, NM, USA

Qualifications & Eligibility

Set-Aside Category
Total Small Business Set-Aside

Agency & Contact

Contracting Organization

Agency
AGRICULTURE, DEPARTMENT OF

Point of Contact

John A. Smith
Contracting Officer
(202) 555-0100

Key Dates

Published3mo ago
Mar 3, 2026
Last Updated3mo ago
Mar 3, 2026
Became Solicitation3mo ago
Mar 3, 2026
Tracked
Response Due3mo ago
Mar 13, 2026
Organized Site Visit3mo ago
Mar 13, 202609:30
RFI Submission Deadline3mo ago
Mar 19, 202613:00
No questions will be accepted after this date and time.
Quote Due Date2mo ago
Mar 30, 202613:00

Description

A Forest Service organized site visit has been scheduled for March 13th, 2026, at 9:30 AM local time. Requests For Information (RFI’s) RFI’s) are required to be submitted to the

Contracting Officer, Troy McCullough ([email protected]), via email no later than March 19th, 2026, 1:00 PM Central Daylight Time. No

questions will be accepted after this date and time. Quote Due Date All quotes shall be emailed to the

Contracting Officer, Troy McCullough ([email protected]), no later than March 30th, 2026, 1:00 PM Central Daylight Time. The Contractor shall furnish all supervision, materials, equipment, vehicles, tools, parts, labor, transportation, and miscellaneous items needed to remove, dispose, and replace the existing HVAC units and associated ducting work. The contractor shall reinstall any damaged HVAC ducting, Ceiling drywall, texture, moisture barrier and insulation that may be required. All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions shall be made without the prior approval of the

Contracting Officer in writing. All submittals for changes or substitutions will be subject to a maximum review time of 10 business days and notice of acceptance or rejection will be sent to the contractor by the CO or COR. The contractor is responsible for complying with all applicable regulations and obtaining all permits for this work. Troy

A. McCullough Contracting (No Street Address

Get matched to contracts like this daily

Free AI-powered contract matching for your business.